![Traub TNL20 Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/traub/tnl20/tnl20_operating-instructions-manual_1153101022.webp)
22
Transport and installation
TNL20
DTE022DE - 02.08.2022
Preparing the machine for transport
Seal disconnected hose lines or pipelines
To prevent leakage of the remaining cutting oil or cooling lubricant from the
lines, the disconnected connection kits or pipelines must be sealed with plugs.
Example shown
Hose from lifting pump for chip conveyor
Connection kits
Corrosion protection
Before delivery, all machines are provided with corrosion protection. For every
further transport, the corresponding corrosion protection must be renewed.
Details on corrosion protection can be found in the documentation
Notes on Operating Materials
.
Содержание TNL20
Страница 6: ...Table of Contents 6 Transport and installation TNL20 DTE022EN 02 08 2022...
Страница 10: ...10 Transport and installation TNL20 DTE022EN 14 03 2022 Safety...
Страница 20: ...20 Transport and installation TNL20 DTE022EN 14 03 2022 General...
Страница 66: ...66 Transport and installation TNL20 DTE022EN 14 03 2022 Electrical connection...
Страница 68: ...68 Transport and installation TNL20 DTE022DE 24 06 2021 Operating material...
Страница 70: ...70 Transport and installation TNL20 DTE022DE 24 06 2021 Pneumatic connection...
Страница 72: ...72 Transport and installation TNL20 DTE022DE 24 06 2021 Switching on the machine...
Страница 73: ......