Wire the UCMs
BMTK-SVN01D-EN
35
®
Figure 17. Daisy-chain termination resistor placement
Comm5 device
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
A
A
A
A
B
B
B
B
COMM
Comm5 device
Splice
2
1
1
3
Tracker
termination board TB1
Legend
Twisted pair, shielded wire
per Trane specifications
Shield termination
Shield ground
=
=
=
Figure note
=
Termination resistor
=
(Last device on the link)
Figure Notes:
1 105
Ω
termination resistor
2 Shield must be cut back and taped at last unit controller.
3 A continuous shield is required. At each unit controller, splice shield wire and tape back to prevent
grounding.
Содержание Tracker Version 12
Страница 1: ...BMTK SVN01D EN Hardware Installation Tracker Version 12 Building Automation System...
Страница 2: ......
Страница 3: ...Hardware Installation Tracker Version 12 Building Automation System BMTK SVN01D EN February 2004...
Страница 4: ......
Страница 30: ...Chapter 2 Termination module mounting 22 BMTK SVN01D EN...
Страница 48: ...Chapter 3 Termination board wiring 40 BMTK SVN01D EN...
Страница 52: ...Chapter 5 Display module mounting 44 BMTK SVN01D EN Figure 22 Tab and slot alignment...
Страница 53: ...Display module mounting BMTK SVN01D EN 45 Figure 23 Display module engagement...
Страница 54: ...Chapter 5 Display module mounting 46 BMTK SVN01D EN...
Страница 70: ...Chapter 7 Troubleshooting 62 BMTK SVN01D EN...
Страница 72: ...Chapter 8 Maintenance 64 BMTK SVN01D EN...
Страница 80: ...Appendix A Installation checklists 72 BMTK SVN01D EN...
Страница 87: ......