®
Chapter 3 Termination board wiring
32
BMTK-SVN01D-EN
UCM wiring configurations
The Tracker UCM Comm5 communication-link wiring must be installed
in a daisy-chain configuration (Figure 15 on page 32 and Figure 16 on
page 33).
Figure 15. Daisy-chain configuration for UCM communication-link
wiring (preferred configuration)
Trane UCM
Trane UCM
Trane UCM
Tracker
Controller
Figure Note:
Maximum wire length for daisy-chained wiring is 4593 ft (1400 m).
Содержание Tracker Version 12
Страница 1: ...BMTK SVN01D EN Hardware Installation Tracker Version 12 Building Automation System...
Страница 2: ......
Страница 3: ...Hardware Installation Tracker Version 12 Building Automation System BMTK SVN01D EN February 2004...
Страница 4: ......
Страница 30: ...Chapter 2 Termination module mounting 22 BMTK SVN01D EN...
Страница 48: ...Chapter 3 Termination board wiring 40 BMTK SVN01D EN...
Страница 52: ...Chapter 5 Display module mounting 44 BMTK SVN01D EN Figure 22 Tab and slot alignment...
Страница 53: ...Display module mounting BMTK SVN01D EN 45 Figure 23 Display module engagement...
Страница 54: ...Chapter 5 Display module mounting 46 BMTK SVN01D EN...
Страница 70: ...Chapter 7 Troubleshooting 62 BMTK SVN01D EN...
Страница 72: ...Chapter 8 Maintenance 64 BMTK SVN01D EN...
Страница 80: ...Appendix A Installation checklists 72 BMTK SVN01D EN...
Страница 87: ......