Pre-installation wiring notes
BMTK-SVN01D-EN
69
®
Pre-installation wiring notes
The wiring for the Tracker system will have been completed prior to
Tracker installation. All Tracker wiring conforms to the following
guidelines:
•
The Tracker controller receives 24 Vac from a dedicated power circuit.
If not, the Tracker controller may malfunction.
•
Each UCM receives 24 Vac from a dedicated power source. If not, the
UCM may malfunction.
•
Input wires and ac power wires are run in separate conduits or wire
bundles. If not, the Tracker controller may malfunction due to
induced electrical noise.
•
Comm5 cable and ac power wires are run in separate conduits or wire
bundles. If not, the Tracker controller may malfunction due to
induced electrical noise.
•
UCM communication cables do not run near lighting ballasts or other
transformers. If they do, the UCM may malfunction due to induced
electrical noise.
Содержание Tracker Version 12
Страница 1: ...BMTK SVN01D EN Hardware Installation Tracker Version 12 Building Automation System...
Страница 2: ......
Страница 3: ...Hardware Installation Tracker Version 12 Building Automation System BMTK SVN01D EN February 2004...
Страница 4: ......
Страница 30: ...Chapter 2 Termination module mounting 22 BMTK SVN01D EN...
Страница 48: ...Chapter 3 Termination board wiring 40 BMTK SVN01D EN...
Страница 52: ...Chapter 5 Display module mounting 44 BMTK SVN01D EN Figure 22 Tab and slot alignment...
Страница 53: ...Display module mounting BMTK SVN01D EN 45 Figure 23 Display module engagement...
Страница 54: ...Chapter 5 Display module mounting 46 BMTK SVN01D EN...
Страница 70: ...Chapter 7 Troubleshooting 62 BMTK SVN01D EN...
Страница 72: ...Chapter 8 Maintenance 64 BMTK SVN01D EN...
Страница 80: ...Appendix A Installation checklists 72 BMTK SVN01D EN...
Страница 87: ......