BMTK-SVN01D-EN
23
®
Chapter 3
Termination board wiring
After mounting the termination module, wire the termination board. The
wiring process consists of wiring the termination board to 24 Vac power,
inputs, outputs, and UCMs. This chapter provides information and
procedures that enable you to wire the termination board. Figure 14 on
page 24 shows all field wiring connections.
Refer to the required and optional supply checklists in Appendix A
(Table 15 and Table 16 on page 65) to verify that you have the materials
required to wire the Tracker controller. When termination board wiring is
complete, use the termination module post-installation checklist in
Appendix A (Table 18 on page 70) to verify the wiring.
Содержание Tracker Version 12
Страница 1: ...BMTK SVN01D EN Hardware Installation Tracker Version 12 Building Automation System...
Страница 2: ......
Страница 3: ...Hardware Installation Tracker Version 12 Building Automation System BMTK SVN01D EN February 2004...
Страница 4: ......
Страница 30: ...Chapter 2 Termination module mounting 22 BMTK SVN01D EN...
Страница 48: ...Chapter 3 Termination board wiring 40 BMTK SVN01D EN...
Страница 52: ...Chapter 5 Display module mounting 44 BMTK SVN01D EN Figure 22 Tab and slot alignment...
Страница 53: ...Display module mounting BMTK SVN01D EN 45 Figure 23 Display module engagement...
Страница 54: ...Chapter 5 Display module mounting 46 BMTK SVN01D EN...
Страница 70: ...Chapter 7 Troubleshooting 62 BMTK SVN01D EN...
Страница 72: ...Chapter 8 Maintenance 64 BMTK SVN01D EN...
Страница 80: ...Appendix A Installation checklists 72 BMTK SVN01D EN...
Страница 87: ......