56
RLC-SVX07A-EN
Installation - Remote Condenser
Oil Charge Determination
The RTUA unit is factory charged with the amount of oil required by the
system, without the field-installed piping. The amount of additional oil
required is dependent upon the amount of refrigerant that is added to the
system for the field installed piping.
Calculate the amount of oil to be added, using the following formula:
Lbs. of R-22 added
Pints of Oil (Trane OIL-31) = for field-installed piping
100
Example
Shown in Figure
26
are RTUA 80 ton and RTCA 80 ton units designed for a
leaving evaporator water temperature of 42 degrees F. This example will
show how to calculate the pipe sizes for both the liquid and discharge lines.
The discharge line consists of one long radius elbow and 4 short radius
elbows. The liquid line also consists of one long radius elbow and 4 short
radius elbows.
Discharge Line
Actual length of horizontal
or downflow lines
= 2 + 5 + 71 = 78 ft.
Actual length of upflow lines
= 15 1/2 + 5 = 20 1/2 ft.
Total equivalent length
= 1 1/2 x (78 + 20 1/2) = 147.75
Approx. line size for horizontal/downflow lines
(Table
12
)
= 2 1/8”
Approx. line size for upflow lines
(Table
13
)
= 2 1/8”
Equiv. length of one long radius elbow at 21/8”
(Table
7
)
= 3 2/5 ft.
Equiv. length of 4 short radius elbows at 2 1/8”
(Table
7
)
= 4 x 5 1/5 ft. = 20 4/5 ft.
Total equivalent length
= 78 + 20 1/2 + 3 2/5 + 20 4/5 = 122.7 ft.
New line size for horizontal/downflow and upflow
lines remains
(Table
12
= 2 1/8”
ALL DISCHARGE LINE SIZES ARE
= 2 1/8”
Liquid Lines
Actual length of horizontal or downflow lines
= 8 + 75 + 20 = 103 ft.
Actual length of upflow lines
= 8 ft.
Total equivalent length
= 1 1/2 X (103 + 8) =166 1/2 ft.
Approx. line size for horizontal/downflow lines
(Table
8
)
= 1 1/8”
Approx. line size for upflow lines
(Table
8
)
= 1 3/8 ft.
Equiv. length of one long radius elbow at 1 1/8”
(Table
7
)
= 1 9/10
Equiv. length of 4 short radius elbows at 1 1/8”
Table
7
)
= 4 x 2 7/10 ft. =10 4/5 ft.
Total equivalent length
= 103 + 8 + 19/10 + 10 2/5 =123 7/10 ft.
Содержание R Series
Страница 17: ...RLC SVX07A EN 17 Installation Mechanical Figure 2 Rigging and Lifting for RTWA Units ...
Страница 22: ...22 RLC SVX07A EN Installation Mechanical Figure 7 Rigging and Lifting for RTUA Units ...
Страница 25: ...RLC SVX07A EN 25 Installation Mechanical Figure 10 Rigging and Lifting for RTCA Condenser ...
Страница 26: ...26 RLC SVX07A EN Installation Mechanical Figure 11 Dimensions and Clearances for RTCA Condenser ...
Страница 69: ...RLC SVX07A EN 69 Installation Electrical Figure 28 Interconnecting Wiring from RTUA to RTCA ...
Страница 129: ...RLC SVX07A EN 129 Start Up Procedures Figure 41 RTWA Unit Sequence of Operation ...
Страница 130: ...130 RLC SVX07A EN Start Up Procedures Figure 42 RTUA Unit Sequence of Operation ...
Страница 154: ...154 RLC SVX07A EN Diagnostics ...
Страница 156: ...156 RLC SVX07A EN 3332 ...
Страница 158: ...158 RLC SVX07A EN 3333 ...
Страница 160: ...160 RLC SVX07A EN 3334 ...
Страница 162: ...162 RLC SVX07A EN 3335 ...
Страница 164: ...164 RLC SVX07A EN 3336 ...
Страница 166: ...166 RLC SVX07A EN 5119 ...
Страница 168: ...168 RLC SVX07A EN 5143 ...
Страница 170: ...170 RLC SVX07A EN 5144 ...
Страница 172: ...172 RLC SVX07A EN 5145 ...
Страница 174: ...174 RLC SVX07A EN 5146 ...
Страница 176: ...176 RLC SVX07A EN 6008 ...
Страница 178: ...178 RLC SVX07A EN 6009 ...
Страница 180: ...180 RLC SVX07A EN 5147 ...
Страница 182: ...182 RLC SVX07A EN 6526 ...
Страница 184: ...184 RLC SVX07A EN 5150 ...
Страница 186: ...186 RLC SVX07A EN 6010 ...