32
RLC-SVX07A-EN
Installation - Mechanical
CAUTION
Equipment Damage!
To prevent damage to chilled water components, do not allow
evaporator pressure (maximum working pressure) to exceed 215
psig.
Provide shutoff valves in lines to the gauges to isolate them from the system
when they are not in use. Use rubber vibration eliminators to prevent
vibration transmission through the water lines.
If desired, install thermometers in the lines to monitor entering and leaving
water temperatures. Install a balancing valve in the leaving water line to
control water flow balance. Install shutoff valves on both the entering and
leaving water lines so that the evaporator can be isolated for service.
A pipe strainer must be installed in the entering water line to prevent water-
borne debris from entering the evaporator.
Evaporator Piping Components
“Piping components” include all devices and controls used to provide proper
water system operation and unit operating safety. These components and
their general locations are given below.
Entering Chilled Water Piping
•
Air vents (to bleed air from system).
•
Water pressure gauges with shutoff valves.
•
Vibration eliminators.
•
Shutoff (isolation) valves.
•
Thermometers (if desired).
•
Cleanout tees.
•
Relief valve.
•
Pipe strainer.
Figure 15
Suggested Piping for Typical RTWA Evaporator
6ENTS
6ALVED
0RESSURE
'AUGE
$RAIN
5NION
6IBRATION
%LIMINATOR
&LOW
3WITCH
/PTIONAL "ALANCING6ALVE
'ATE6ALVE
5NION
7ATER
3TRAINER
6IBRATION
%LIMINATOR
'ATE6ALVE
2ELIEF
6ALVE
Содержание R Series
Страница 17: ...RLC SVX07A EN 17 Installation Mechanical Figure 2 Rigging and Lifting for RTWA Units ...
Страница 22: ...22 RLC SVX07A EN Installation Mechanical Figure 7 Rigging and Lifting for RTUA Units ...
Страница 25: ...RLC SVX07A EN 25 Installation Mechanical Figure 10 Rigging and Lifting for RTCA Condenser ...
Страница 26: ...26 RLC SVX07A EN Installation Mechanical Figure 11 Dimensions and Clearances for RTCA Condenser ...
Страница 69: ...RLC SVX07A EN 69 Installation Electrical Figure 28 Interconnecting Wiring from RTUA to RTCA ...
Страница 129: ...RLC SVX07A EN 129 Start Up Procedures Figure 41 RTWA Unit Sequence of Operation ...
Страница 130: ...130 RLC SVX07A EN Start Up Procedures Figure 42 RTUA Unit Sequence of Operation ...
Страница 154: ...154 RLC SVX07A EN Diagnostics ...
Страница 156: ...156 RLC SVX07A EN 3332 ...
Страница 158: ...158 RLC SVX07A EN 3333 ...
Страница 160: ...160 RLC SVX07A EN 3334 ...
Страница 162: ...162 RLC SVX07A EN 3335 ...
Страница 164: ...164 RLC SVX07A EN 3336 ...
Страница 166: ...166 RLC SVX07A EN 5119 ...
Страница 168: ...168 RLC SVX07A EN 5143 ...
Страница 170: ...170 RLC SVX07A EN 5144 ...
Страница 172: ...172 RLC SVX07A EN 5145 ...
Страница 174: ...174 RLC SVX07A EN 5146 ...
Страница 176: ...176 RLC SVX07A EN 6008 ...
Страница 178: ...178 RLC SVX07A EN 6009 ...
Страница 180: ...180 RLC SVX07A EN 5147 ...
Страница 182: ...182 RLC SVX07A EN 6526 ...
Страница 184: ...184 RLC SVX07A EN 5150 ...
Страница 186: ...186 RLC SVX07A EN 6010 ...