126
RLC-SVX07A-EN
Pre-Start Checkout
Phase Sea. Lead Terminal
Black (Phase A) ..................... L1
Red (Phase B) ....................... L2
Yellow (Phase C) .................... L3
4.
Turn power on by closing the unit supply power fused-disconnect switch.
5.
Read the phase sequence on the indicator. The “ABC” LED on the face of
the phase indicator will glow if phase is “ABC”.
6.
If the “CBA” indicator glows instead, open the unit main power discon-
nect and switch two line leads on the line power terminal block(s) (or the
unit mounted disconnect). Reclose the main power disconnect and
recheck the phasing.
CAUTION
Equipment Damage!
Do not interchange any load leads that are from the unit
contactors or the motor terminals.
7.
Reopen the unit disconnect and disconnect the phase indicator.
Water System Flow Rates
Establish a balanced chilled water flow through the evaporator. The flow rates
should fall between the minimum and maximum values given in Table
1
.
Chilled water flow rates below the minimum values will result in laminar flow,
which reduces heat transfer and causes either loss of EXV control or repeated
nuisance, low temperature cutouts. Flow rates that are too high can cause
tube erosion and damage to the tube supports and baffles in the evaporator.
The flow rates through the condenser must also be balanced, according to
the flow rates in
Table
1
.
Water System Pressure Drop
Measure water pressure drop through the evaporator and condenser at the
field-installed pressure taps on the system water piping. Use the same gauge
for each measurement. Do not include valves, strainers fittings in the
pressure drop readings.
Pressure drop readings should be approximately those shown in the Pressure
Drop Charts,
Figures
16
,
17
and
18
.
Содержание R Series
Страница 17: ...RLC SVX07A EN 17 Installation Mechanical Figure 2 Rigging and Lifting for RTWA Units ...
Страница 22: ...22 RLC SVX07A EN Installation Mechanical Figure 7 Rigging and Lifting for RTUA Units ...
Страница 25: ...RLC SVX07A EN 25 Installation Mechanical Figure 10 Rigging and Lifting for RTCA Condenser ...
Страница 26: ...26 RLC SVX07A EN Installation Mechanical Figure 11 Dimensions and Clearances for RTCA Condenser ...
Страница 69: ...RLC SVX07A EN 69 Installation Electrical Figure 28 Interconnecting Wiring from RTUA to RTCA ...
Страница 129: ...RLC SVX07A EN 129 Start Up Procedures Figure 41 RTWA Unit Sequence of Operation ...
Страница 130: ...130 RLC SVX07A EN Start Up Procedures Figure 42 RTUA Unit Sequence of Operation ...
Страница 154: ...154 RLC SVX07A EN Diagnostics ...
Страница 156: ...156 RLC SVX07A EN 3332 ...
Страница 158: ...158 RLC SVX07A EN 3333 ...
Страница 160: ...160 RLC SVX07A EN 3334 ...
Страница 162: ...162 RLC SVX07A EN 3335 ...
Страница 164: ...164 RLC SVX07A EN 3336 ...
Страница 166: ...166 RLC SVX07A EN 5119 ...
Страница 168: ...168 RLC SVX07A EN 5143 ...
Страница 170: ...170 RLC SVX07A EN 5144 ...
Страница 172: ...172 RLC SVX07A EN 5145 ...
Страница 174: ...174 RLC SVX07A EN 5146 ...
Страница 176: ...176 RLC SVX07A EN 6008 ...
Страница 178: ...178 RLC SVX07A EN 6009 ...
Страница 180: ...180 RLC SVX07A EN 5147 ...
Страница 182: ...182 RLC SVX07A EN 6526 ...
Страница 184: ...184 RLC SVX07A EN 5150 ...
Страница 186: ...186 RLC SVX07A EN 6010 ...