
Installation
7
BAS-SVX08D-E4
Mounting and wiring
PIC mounting recommendations
To mount the PIC device:
•
Select a location near the controlled equipment to reduce wiring costs
and EMC disturbance risks.
•
Verify that the location conforms to the specifications below.
•
Secure the controller to a 35 mm DIN rail (Use only 10/10 mm thickness
sheet) or directly mount the PIC using four M3 screws (not supplied).
1 = Screw holes
2 = DIN rail
Table 2 - PIC specifications
Board dimensions
95 mm height x 132 mm width x 60 mm depth
Minimum clearances
Front 100 mm
Each side 25 mm
Top and bottom 100 mm
Operating environment Temperature: from -40° to 70°C
Relative Humidity: from 5% to 95% non-condensing
Dust protection: pollution level 1
Storage environment
Temperature: from -50° to 85°C
Relative Humidity: from 5% to 95% non-condensing
Protocol Interface
Controller
MODBUS
Tx
Rx
RS485
RS232
A
Ref
B
RJ-45
Resistor
On
DIAG
USB
COMM3
1
Tx
Rx
2
SHD
Service
PIN
LON
B
A
B
A
24V
GND
CONFIGURATION
SW1
SW2
SW3
SW4
Rx
Serv.
0V
ON
24 V
Imax=0.5A
1
1
2
2
1
1
Содержание PIC
Страница 64: ...Maintenance BAS SVX08D E4 64 PIC Status...
Страница 69: ...Maintenance 69 BAS SVX08D E4 Modbus Communication Status...
Страница 78: ...Notes BAS SVX08D E4 78...
Страница 79: ...Notes 79 BAS SVX08D E4...