RLC-ADF005D-EN
4. Gauges, thermometers, and air vents
Installed on both sides of evaporator
Installed on both sides of condenser and heat recovery condenser (as applicable)
5. Wiring
Wire size per submittal and NEC 310-16.
Full power available
External interlocks (flow switch, pumps auxiliary, etc.)
Chilled water pump (connected and tested)
Condenser water pump (connected and tested)
Cooling tower fan rotation checked
Heat recovery condenser water pump (as applicable)
115 Vac power available for service tools as required
All controls installed and connected
6. Testing
Dry nitrogen available for pressure testing
Trace gas amounts of R-134A or R-513A available for leak testing, if necessary
7.
Refrigerant on job site
8.
Systems can be operated under all actual load conditions
9. Heaters
Energize oil sump and compressor heaters and verify they are operational using a temperature probe.
If unit was factory charged (model number digit 35 = A),
energize
heaters for 24 hours prior to start up.
Important:
It is required that heaters are energized for a minimum of 24 hours prior to start up.
Therefore, chiller should have power for this amount of time before Trane Service arrives
to do start-up.
If unit has nitrogen charge (model number digit 45 = 1), contact Trane Service for unit charging prior to start-up.
10. Equipment room
Does the equipment room have a refrigerant monitor/sensor capable of monitoring and alarming within the allowable
exposure level of the refrigerant?
Does the installation have properly placed and operating audible and visual refrigerant alarms?
Does the equipment room have proper mechanical ventilation?
If it is required by local code, is a self-contained breathing apparatus available?
11. Owner awareness
Does the owner have a copy of the MSDS for refrigerant?
Содержание Optimus RTHD
Страница 27: ...Installation Mechanical RTHD SVX01K EN 27...
Страница 28: ...Installation Mechanical 28 RTHD SVX01K EN...
Страница 29: ...Installation Mechanical RTHD SVX01K EN 29...
Страница 54: ...Controls 54 RTHD SVX01K EN Figure 23 Tracer TU...
Страница 88: ...Log and Check Sheets 88 RTHD SVX01K EN Page Left Intentionally Blank...
Страница 95: ...Notes RTAF SVX001K EN 95...