6.4 Lifting Procedure
At times, the PT-30 may need to be
lifted with the optional lift kit. This
section addresses the proper proce-
dures and attachment points for
these activities.
Lifting
Lifting the machine from above
should only be done with the optional
lift kit installed as shown. (fig. 6.4-1) The machine should only be lift-
ed with a lifting device and chains that are rated for lifting a machine
of this size and weight.
The chains must be attached at all four corners of the machine to
the lifting eyes and should be connected to a common lift point on
the lifting device centered over the machine (use spreader bars if
necessary). This will help to balance the machine as well as distrib-
ute the weight evenly while being lifted.
Lift the machine straight up in a slow and careful manner. Lower it
this same way making sure all bystanders are clear of the machine
and its expected path.
If it is necessary to lift attachments or parts from the machine,
always use a lifting device and straps/chains rated for lifting items of
the size and weight of the component(s) to be lifted.
60
6.4-1
When lifting attachments or components, use caution. Attach
straps or chains securely and in such a way that they evenly
distribute the weight of the item to be lifted, ensuring a balanced
load. Stay clear of expected travel path.
6 TRANSPORTATION
Содержание Terex PT30CE
Страница 7: ...6...
Страница 31: ...30...
Страница 33: ...32...
Страница 39: ...38...
Страница 47: ...46...
Страница 57: ...56...
Страница 63: ...62...
Страница 82: ...Hours Service Performed Notes SERVICE LOG 81...
Страница 83: ...Hours Service Performed Notes SERVICE LOG 82...
Страница 84: ...Hours Service Performed Notes SERVICE LOG 83...