5.6 Grading
Steps: (see illustration)
1.
Lower the lift arms until they rest on the frame.
2.
Tilt the bucket slowly forward until the cutting edge engages
the ground.
3.
Drive the machine forward making slight bucket angle adjust-
ments to vary cut depth as necessary.
4.
When full, curl the bucket and raise the lift arms simultaneously.
Once clear, lower them to approximately 25-30 cm above the
ground for transporting.
5.7 Leveling
Steps: (see illustration)
1.
Moving forward, raise the lift arms as you tilt the bucket slowly
forward to evenly spread the material out over the ground.
2.
Once the load is released, tilt the bucket forward to an angle
45° or less to the ground.
3.
Lower the lift arms until the cutting edge rests on the ground.
4.
Engage the float function and back the machine over the materi-
al varying bucket angle slightly as necessary to maintain grade.
5 OPERATION
50
Do not push or pull dirt as done in digging, grading, or leveling oper-
ations with the bucket tilted fully forward into the “Dump” position.
This will stress the bucket cylinders and may damage them.
NOTICE
Содержание Terex PT30CE
Страница 7: ...6...
Страница 31: ...30...
Страница 33: ...32...
Страница 39: ...38...
Страница 47: ...46...
Страница 57: ...56...
Страница 63: ...62...
Страница 82: ...Hours Service Performed Notes SERVICE LOG 81...
Страница 83: ...Hours Service Performed Notes SERVICE LOG 82...
Страница 84: ...Hours Service Performed Notes SERVICE LOG 83...