![Toshiba GX9 ASD Скачать руководство пользователя страница 35](http://html.mh-extra.com/html/toshiba/gx9-asd/gx9-asd_quick-start-manual_424980035.webp)
GX9 ASD Quick Start Guide
25
Startup and Test
Perform the following checks before turning on the unit:
•
L1/R
,
L2/S
, and
L3/T
are connected to the 3-phase input power.
•
T1/U
,
T2/V
, and
T3/W
are connected to the motor.
• The 3-phase input voltage is within the specified tolerance.
• There are no shorts and all grounds are secured.
• Front door is closed and all enclosure panels are securely fastened.
• All personnel are clear of the area of the installation and the driven equipment.
Save User Settings
Use the following table to record any changed parameters for future reference.
Table 4. ASD Parameter Changes by Installer/Maintenance Personnel.
ASD ID__________Name:______________________Date:_______
Notes
Parameter
Number
Parameter Name
Default or
Previous
Setting
New Setting
Unit of
Measure
Note:
Settings may also be recorded via Program
Utilities
Type Reset
Save User Settings
.
Содержание GX9 ASD
Страница 1: ...GX9 ASD Quick Start Guide TOSHIBA GX9 ASD Quick Start Guide DN 66900 001 March 2014 ...
Страница 2: ......
Страница 3: ...Document Number 66900 001 March 2014 GX9 ASD Quick Start Guide ...
Страница 4: ......
Страница 88: ...78 GX9 ASD Quick Start Guide Figure 33 GX9 ASD 5 0 20 HP Enclosure ...
Страница 89: ...GX9 ASD Quick Start Guide 79 Figure 34 GX9 ASD 25 75 HP Enclosure ...
Страница 90: ...80 GX9 ASD Quick Start Guide Figure 35 GX9 ASD 100 200 HP Enclosure ...
Страница 91: ...GX9 ASD Quick Start Guide 81 Figure 36 GX9 ASD 250 400 HP Enclosure ...
Страница 92: ...82 GX9 ASD Quick Start Guide Figure 37 GX9 ASD 500 800 HP Enclosure ...
Страница 93: ...GX9 ASD Quick Start Guide 83 Figure 38 GX9 ASD 900 1200 HP Enclosure ...
Страница 99: ......