3-1 Installation work flow
Work flow
0. System planning
Contents
Reference No.
1. Setup file data preparation
2. Setup file creation
3. On site installation
(Construction work)
4. On site installation
(Wiring)
5. On site installation
(Control system configuration)
6. On site installation
(Address setting)
7. Trial operation and adjustment
8. Commissioning
Air conditioner equipments
selection
Control system device selection
System wiring diagram
Power meter wiring diagram
Address list
Schedule list
Create setup files by excel macro
software
Control system installation
Wiring power cable/
communication line
Network connection
Energy monitoring PC
configuration
Intellignet server configuration
Setup file installation
Air conditioner address setting
Control system device address
setting
Chapter. 2
3-2
3-3
3-4
3-5
3-6
3-7
Chapter. 4
Chapter. 5
Содержание BMS-TP0640ACE
Страница 1: ...FILE NO A04 016 TCS NET AIR CONDITIONING CONTROL SYSTEM TOUCHSCREENCONTROLLER TENTATIVE ...
Страница 16: ...16 ...
Страница 17: ...17 2 SYSTEM CONFIGURATION 2 1 Touch screen controller system configuration ...
Страница 22: ...22 ...
Страница 54: ...54 ...
Страница 96: ...96 ...
Страница 103: ...103 ...
Страница 104: ......