2.
Assemble the agitation-valve bracket to the mount for
the throttle-valve bracket (
) with 2 flange-head
bolts (5/16 x 3/4 inch).
3.
Torque the flange-head bolts to 1978 to 2542 (175 to
225 in-lb).
Assembling the Throttle Valve and
Eductor-Shutoff Valve for Machines
with the Optional Eductor Kit
1.
Align the slots in the agitation-throttle bracket and the
slots in the eductor-shutoff bracket with the holes in
the mount for the throttle-valve bracket (
).
Figure 61
1.
Agitation throttle bracket)
4.
Flange-head bolt (5/16 x
3/4 inch)
2.
Bracket (throttle valve)
5.
Front of the machine
3.
Eductor-shutoff bracket
2.
Assemble the agitation-valve bracket and
eductor-shutoff bracket to the mount for the
throttle-valve bracket (
) with 2 flange-head
bolts (5/16 x 3/4 inch).
3.
Torque the flange-head bolts to 1978 to 2542 (175 to
225 in-lb).
13
Installing the Agitation-Nozzle
Assembly and Hoses
Parts needed for this procedure:
1
Agitation-nozzle assembly
Procedure
1.
Insert the 3 agitation nozzles of the agitation-nozzle
assembly into the bulkhead fittings of the sprayer tank
(
).
Figure 62
1.
Agitation nozzle
(agitation-nozzle
assembly)
3.
Agitation-nozzle assembly
2.
Retainer
4.
Bulkhead fitting
2.
Secure the agitation nozzles with the 3 retainers (
) that you removed in step
of
Agitation Nozzles from the Sprayer Tank (page 13)
.
3.
Assemble the 90° quick-connect fitting of the
agitation-nozzle assembly onto the quick coupling of
the agitation throttle valve with the retainer that is
supplied with the agitation-hose assembly (
).
30
Содержание 136-0372
Страница 61: ...Schematics Flow Diagram Rev A 61...
Страница 62: ...Notes...
Страница 63: ...Notes...
Страница 64: ......