Figure 104
Machines with the spray wand kit or electric hose-reel kit
1.
90° elbow (with pressure
port)
3.
Pressure sense tube
2.
Tube connector
20
Completing the Installation
of the Arag to KZ Valve
Conversion Kit
No Parts Required
Procedure
1.
Connect the positive (red) cable to the positive (+)
battery post and the negative (black) cable to the
negative (–) battery post using the bolts and nuts; refer
to
in
Disconnecting the Battery (page 6)
.
2.
Slide the insulator boot over both battery posts ; refer
to
in
Disconnecting the Battery (page 6)
.
3.
Move the prop rod for the seat into the slot and tilt the
seat down until it latches securely.
Product Overview
Controls
Regulating (Rate-Control) Valve
This valve, located behind the tank (
), controls
the amount of fluid that is routed to the booms or the rate
return to the tank.
Figure 105
1.
Regulating (rate-control)
valve
4.
Flowmeter
2.
Agitation valve
5.
Boom-section valves
3.
Master-boom valve
Master-Boom Valve
The master-boom valve (
) is used to stop the flow
to the flowmeter and boom valves.
Boom-Section Valves
The section valves control flow to the 3 boom sections and
they can be turned on or off (
).
49
Содержание 136-0372
Страница 61: ...Schematics Flow Diagram Rev A 61...
Страница 62: ...Notes...
Страница 63: ...Notes...
Страница 64: ......