11.
Apply removable thread-locking compound to
the 2 setscrews (5/16 x 3/4 inch) and install them
into the hub assembly to secure the hydraulic
pump shaft (
9
Installing Hydraulic Lines 3
and 4
Parts needed for this procedure:
1
Hydraulic line number 3
1
Hydraulic line number 4
Procedure
Note:
Install all hydraulic lines loosely first and then
tighten them when all everything is installed.
Use
as a key for identifying the correct
hydraulic lines.
g015920
Figure 23
1.
Hydraulic line number 1
4.
Hydraulic line number 4
2.
Hydraulic line number 2
5.
Hydraulic line number 5
3.
Hydraulic line number 3
1.
Install the existing hoses back onto the hydraulic
tank.
2.
Install the hydraulic tank to the frame and secure
it with the 3 brackets previously removed and
loosened (
g003575
Figure 24
1.
Hydraulic tank
4.
Nut
2.
Bolt
5.
Side bracket
3.
Top bracket
6.
Washer
3.
Install hydraulic line number 4 to the tee fitting
assembled to the side of the valve (
g016164
Figure 25
1.
Small 90-degree tee with
barb in hydraulic tank
4.
Tee fitting
2.
Hydraulic line number 4
5.
Hydraulic tank
3.
Valve
4.
Position hydraulic line number 3 into the
machine as shown in
5.
Install hydraulic line number 3 to the large
90-degree elbow installed to the strainer and
hydraulic tank (
and
).
12