Page 2-26
Document Ref 942583-001 Rev 8
Site Preparation
Quantium 510 Installation Manual
2.3.3
VAPOUR RECOVERY CONNECTIONS
VR Connection - Standard (no shear valve)
VR Connection with OPW Shear Valve (Option)
For M8 screw
Connection
Flange Level
Island Level
Driptray
height
70
78
80
M10x45 Bolt
Flange on Dispenser
VR Flexi
900015-022
901596
900758-003
Insulation Sleeve
901320-001
900011-004
901772
901859
Flange 1" 78mm
M10 Nut
Nipple
Gasket
Underside of dispenser
Driptray
height
70
Terminate VR pipe
34.5mm below dispenser
Fix to driptray
Fix to ground frame
IMPORTANT
Assembly below the shear point
must be secured to the ground
frame (NOT dispenser frame)
56.5
NOTE : All threads must be
sealed using Loctite 577
Weak point level with
top of ground frame
VR Riser Pipe
with
male
thread
G1"
Содержание Quantium 510
Страница 1: ...Document Ref 942583 001 Rev 8 04 2015 Quantium 510 Installation Manual...
Страница 10: ...8 Document Ref 942583 001 Rev 8 Contents Quantium 510 Installation Manual This page is intentionally blank...
Страница 133: ...Document Ref 942583 001 Rev 8 Page 5 47 Quantium 510 Installation Manual Installation This page is intentionally blank...