![Tokheim Quantium 510 Скачать руководство пользователя страница 78](http://html1.mh-extra.com/html/tokheim/quantium-510/quantium-510_installation-manual_1124937078.webp)
Page 4-2
Document Ref 942583-001 Rev 8
Packaging & Handling
Quantium 510 Installation Manual
4
PACKAGING & HANDLING
4.1
Shipping Documentation
The following documents will accompany every delivery:-
•
Shipping List
•
Packing/Checking List
•
CE Sticker
•Certificate of Conformity
The Serial Number on the dispenser should be identical to the Serial Number on the Shipping
List, CE sticker and Certificate of Conformity. Please inform Tokheim UK Ltd before
unpacking if there are any discrepancies in the notation.
4.2
Packaging
The type of packing depends on the destination of the goods. All products containing a
frame are fixed on a pallet by means of screws and by the use of beams or blocks screwed
onto the frame.
The goods are protected from moisture and scratching by bubble wrap and polystyrene
corner blocks and a standard carton is used for packing. Where the use of a forklift truck
or pallet truck is necessary, special arrangements make this possible through the use of
pallets, beams, dispenser beam bridges or blocks.
All separate components belonging to the same delivery are packed together.
4.2.1
UNPACKING
When the dispensers arrive at the installation site, the unpacked units should be
inspected for possible shipping damage. If damage is evident, it must be reported
to the carrier. Shipping damage is not covered under the Tokheim warranty
policy.
After checking the equipment, the dispenser may be unwrapped. Cladding is
packed in such a way that paint, screening and stickers are protected. Take
care when unwrapping so that these elements are not damaged.
After unwrapping, the dispensers must be checked for any faults or damage.
Any faults or damage found must be reported to the Installation Supervisor
immediately.
Make sure that all packing materials are removed from the service station. It is
recommended that you discuss this with the station’s supervisor.
4.3
Inventory Inspection
After unpacking and prior to installation, the delivered equipment should be inspected to
ensure that all the required materials are on hand, and the dispensers have all the ordered
options and markings. If discrepancies in dispenser options and markings are evident,
contact your local Tokheim divisional representative. Refer to the back cover of this manual.
Содержание Quantium 510
Страница 1: ...Document Ref 942583 001 Rev 8 04 2015 Quantium 510 Installation Manual...
Страница 10: ...8 Document Ref 942583 001 Rev 8 Contents Quantium 510 Installation Manual This page is intentionally blank...
Страница 133: ...Document Ref 942583 001 Rev 8 Page 5 47 Quantium 510 Installation Manual Installation This page is intentionally blank...