2.3 Preparation for use
2.3.1 Commission guidelines
Prior to the turnstile energization:
1)
make sure of proper connection and good condition of all connecting cables;
2)
clear the turnstile blade opening area from foreign particles.
When mains cable of power supply unit is connected to the network, the turnstile actuating
mechanism is energized. Blades are locked from opening.
The turnstile is set in initial state: entry and exit LED displays are blue.
2.3.2 Required inspections
2.3.2.1 When the turnstile is commissioned it is necessary to perform inspections specified
in
Table 7
. During inspections the wiring diagram according to Annex C and the control panel
according to Appendix B to be used.
Table 7
Operation Mode
Mode Setting
LED Display
1
2
3
1.Turnstile is
closed in both
directions (initial
state)
–
Blue LED is lit
2. Single access in
one direction
"SINGLE" button to be pushed
for access in chosen direction
(“A” or “B”)
Green arrows of authorized single
access in chosen direction is lit and
blue LED display in opposite
direction is lit
3. Single access in
both directions
Both "SINGLE" buttons to be
pushed
for
access
in
both
directions (“A” and “B”)
Green arrows of single access in
both directions are lit