21
-
Two frame screws to be loosened and removed at the bottom of the turnstile frame base
(View С);
-
The turnstile to be removed from pallet;
Fig. 10
–
Turnstile removal from pallet
4)
Make sure that the turnstile installation area is ready as follows:
The site surface to be flat and horizontal;
Thickness of concrete blinding coat under the site to be at least 150 mm.
WARNING:
The turnstile is fixed by means of Redibolt (with jacket and screw) included in the
scope of delivery.
5) The turnstile fixation holes to be marked on the site surface according to
Figure 11
. The
turnstile itself, located upright at the installation site, can be used as a template.