24
Fig. 14
–
Fixation points by means of
anchors
Fig. 15
–
Connection of power supply cable
9) The length of cable free ends to be at least 1 m
to provide cable entry, termination and connection to
the relevant terminals in the turnstile post.
10) The cable outlet point to be aligned with the
hole on the turnstile mounting plate.
11) The turnstile to be installed upright at the
prepared location.
12)
Cables to be pulled through available access
holes in the turnstile post bottom end part by reclining
the turnstile
.
13) Fixation holes at the turnstile bottom plate to
be aligned with prepared surface holes.
14) The turnstile to be fixed by means of anchors
included in the scope of delivery
(Fig. 14).
15) Turnstile connection:
a) Power supply cable ~230 V to be connected
(
Fig
. 15):
-
Phase (L) to be connected to circuit breaker;
- Neutral (N) to be connected to terminal ~230
V (N);
-
Earth (РЕ) to be connected to earthing
terminal (РЕ).
b)
Control panel cable to be connected to
terminals (
Fig.16
)
:
-
P
(Power)
–
control panel power
supply
+12V;
Fig.13
–
Cable entries Master and Slave pedestals