22
IMPORTANT! Pedestals are linked by control line optical sensor system requiring
accurate positioning of pedestals. The relative position of pedestals and vertical
position of the turnstile to be respected.
Fig. 11
–
Installation dimensions of “SpeedBlade” type
turnstile
6)
The relevant holes to be drilled on the surface according to the marking due to
diameter of anchors (12×120М10) for the turnstile fixation.
7)
Anchor jackets to be inserted into the prepared holes
WARNING:
The turnstile installation and fixation to be performed only after all electric
cables to be connected to the turnstile are pulled
8) The following cables to be run to the turnstile installation site:
Power supply cable 230 V ~;
Control panel connection cable;
Access Control System connection cables, if it is available;
Cables between pedestals (
Figure 15 and 16);
Cables to be run in corrugated or metal pipes.