6
Maintenance
Cleaning Ion Source Components
88
TSQ Quantum XLS Series User Guide
Thermo Scientific
6. Reinstall the ion source into the mass spectrometer and reinsert the capillary column into
the ion source. See
.
7. Restart the system. See
“Starting Up the System after a Complete Shutdown”
Removing the Ion Source
Remove the ion source to clean the lenses or replace the filament.
Y
To remove the ion source
1. Shut down and vent the mass spectrometer. See
“Shutting Down the System Completely”
2. Pull back the capillary column:
a. Lower the oven, injector, and transfer line temperatures to 30 °C and allow them to
cool before continuing.
b. Once the oven, injector, and transfer line are cool, turn off the gas chromatograph.
c.
Loosen the transfer line nut. See
.
d. Pull back the column. (You can first mark the column’s position with white
correction fluid or something similar.)
3. Prepare a clean work area by covering the area with lint-free cloth.
4. Undo the two latches that secure the lid of the ion source vacuum manifold, and open
the lid.
Tools needed
• Gloves, cleanroom grade (P/N 23827-0008 and 23827-0009)
• Lint-free cloth
Frequency
As needed to perform ion source maintenance
WARNING
Shock Hazard
. Unplug the mass spectrometer before proceeding.
CAUTION
Do not remove the ion source without first pulling back the GC capillary
column, or else the capillary column might break.
WARNING
Burn Hazard
. The GC oven, injector, and transfer line are hot.
Allow them to cool to room temperature before touching them.
Содержание TSQ Quantum XLS
Страница 1: ...TSQ Series TSQ Quantum XLS Series User Guide 70111 97225 Revision A December 2011 ...
Страница 3: ......
Страница 4: ......
Страница 12: ......
Страница 16: ......
Страница 32: ......
Страница 64: ......
Страница 76: ......
Страница 102: ...86 TSQ Quantum XLS Series User Guide Thermo Scientific Figure 50 Ion source assembly assembled and exploded views ...
Страница 160: ......
Страница 166: ......
Страница 176: ......