8
•
Troubleshooting
Page 126
UHPLC System
Operating Manual
8.2.10.1
Basic Tightness Test
The
Basic Tightness Test
checks the tightness of the pump and
autosampler.
Follow these steps
1. Run the test from the Chromeleon software. Refer to the
Chromeleon Help
.
The test runs automatically without further user interaction.
2. If the test fails, check the Chromeleon Audit Trail for a message. For
remedial actions refer to the
Troubleshooting
section in the
Operating Manual
for the module for which the test failed.
8.2.10.2
Grating Motor Test
The
Grating Motor Test
checks the mechanical stability of the grating
drive. The test is available for the variable wavelength detector.
Follow these steps
1. Install the diagnostics cell in the detector.
2. Run the test from the Chromeleon software. Refer to the
Chromeleon Help
.
3. Depends on the test result:
Test result
Action
Passed
Reinstall the flow cell of your application.
Failed
Contact Thermo Fisher Scientific Technical Support.
Содержание thermoscientific Vanquish UHPLC System
Страница 1: ...thermoscientific Vanquish UHPLC System Operating Manual 4820 3601 EN Revision 4 0 December 2019 ...
Страница 4: ...Contacting Us Page 4 UHPLC System Operating Manual ...
Страница 28: ...2 Safety Page 28 UHPLC System Operating Manual ...
Страница 34: ...3 System Overview Page 34 UHPLC System Operating Manual ...
Страница 38: ...4 Unpacking Page 38 UHPLC System Operating Manual ...
Страница 82: ...5 Installation Page 82 UHPLC System Operating Manual ...
Страница 100: ...6 Operation Page 100 UHPLC System Operating Manual ...
Страница 112: ...7 Maintenance and Service Page 112 UHPLC System Operating Manual ...
Страница 128: ...8 Troubleshooting Page 128 UHPLC System Operating Manual ...
Страница 132: ...9 Specifications Page 132 UHPLC System Operating Manual ...
Страница 144: ...11 Appendix Page 144 UHPLC System Operating Manual ...
Страница 148: ...Thermo Fisher Scientific Inc 168 Third Avenue Waltham Massachusetts 02451 USA www thermofisher com ...