Clutch Maintenance
11-6
Bushing Insertion
*DO NOT USE SOAP OR OIL TO LUBRICATE BUSHING PRIOR TO ASSEMBLY.
2. Remove the inner race from the roller bearing, apply a small amount of Loctite (see Tool Catalog) to race I.D. and press onto
the housing shaft, seating against the step.
3. Apply Loctite (see Tool Catalog) to O.D. of oil seal, then press seal in end of hub opposite the flange to a depth of
approximately 1/16 in. below the surface.
4. Apply a
small
amount of Loctite (see Tool Catalog) to O.D. of roller bearing and press into hub bore from the flange end until
seated against the step in bore.
5. Slip large and
small
spacer into hub I.D. seating against the roller bearing.
6. Apply Mobil
TM
(see Tool Catalog) grease to roller bearing and fill cavity between large and small spacers. A small amount
of grease should also be applied to the seal lip and space between the seal and roller bearing.
7. Pack ball bearing with Mobil
TM
(see Tool Catalog) grease.
8. Apply a
small
amount of Loctite (see Tool Catalog) to O.D. of ball bearing and press into hub until seated against spacer.
Wipe excess Loctite from hub.
9. Install retaining ring.
10. Position shoes in a circle on flat surface and install springs on shoes.
11. Position shoes on the hub.
12. Install 1/4-28 x 1-3/4 in. screws through links, then external tooth 1/4 in. lockwasher. Then slide through bushings in shoes
and hub.
13. Install remaining lockwashers then links and 1/4-28 in. locknuts, torquing them to 110 ± 5 in.-lbs (12.5 ± 6 N•m).
NOTE: Shoes MUST be held tightly against hub while nuts are tightened.
14. Place the hub and shoe assembly into the housing and place flatwasher over the bearing.
15. Apply Loctite (see Tool Catalog) to 3/8-16 x 1 in. screw and install through washer into housing shaft. The housing and hub
will be drawn together to the proper relative position as the screw is tightened. Tighten the screw to 30 to 35 fT-lbs (41 to 48
N•m).
CAUTION: During all bearing assembly, care must be taken to prevent Loctite from entering
bearing.
Содержание T-1000R
Страница 14: ...Safety Precautions 2 6 Warning Decals 2e24151g0 ...
Страница 18: ...Specifications 3 4 ENGINE CLUTCH Engagement 600 100 RPM Dynamic Torque 66 fT lb 89 5 N m minimum 1600 RPM ...
Страница 34: ...Maintenance Inspection Schedule 4 10 ...
Страница 57: ...Unit Description 5 23 Purge Mode UT Series 1 3 4 5 2 ...
Страница 67: ...Unit Description 5 33 Zone 1 Cool and Zone 2 Cool UT SPECTRUM Units ...
Страница 69: ...Unit Description 5 35 Purge Mode UT SPECTRUM Units ...
Страница 71: ...Unit Description 5 37 Zone 1 Cool and Zone 2 Heat UT SPECTRUM Units ...
Страница 72: ...Unit Description 5 38 ...
Страница 74: ...Diesel Electric Menu 6 28 Adjust Brightness 6 29 Time 6 30 ...
Страница 120: ...Operating Instructions Standard HMI 7 18 ...
Страница 152: ...Engine Maintenance 9 14 T Series Fuel and Oil System Components TK 376 ...
Страница 154: ...Engine Maintenance 9 16 T Series Fuel and Oil System Components TK 270 ...
Страница 156: ...Engine Maintenance 9 18 UT Series Fuel System Components AMA768 ...
Страница 172: ...Engine Maintenance 9 34 T Series Engine Mounting Components for 2 Cylinder Engine ...
Страница 184: ...Engine Maintenance 9 46 ...
Страница 238: ...Refrigeration Maintenance 10 54 ...
Страница 246: ...Clutch Maintenance 11 8 ...
Страница 258: ...Structural Maintenance 12 12 ...
Страница 264: ...Mechanical Diagnosis 13 6 ...
Страница 265: ...14 Electric Standby Diagnosis ...
Страница 268: ...Electric Standby Diagnosis 14 4 ...
Страница 269: ...15 Refrigeration System Diagnosis ...
Страница 272: ...Refrigeration System Diagnosis 15 4 ...
Страница 280: ...Remote Evaporators 16 8 ...
Страница 282: ...Wiring Diagrams and Wiring Schematics 17 2 ...