Unit Description
5-25
Zone 1 Cool and Zone 2 Cool T-800R/T-1000R/T-1200R SPECTRUM Units
High pressure refrigerant vapor leaves the compressor and flows through the open CIS to the condenser where the refrigerant
releases heat and condenses into high pressure liquid. The liquid refrigerant flows through the CCV, receiver tank, and drier, into
the liquid lines.
The LLS1 is open so some of the refrigerant flows through the Zone 1 heat exchanger and expansion valve into the evaporator.
There, liquid refrigerant absorbs heat as it evaporates into low pressure vapor. The refrigerant returns to the compressor through
the heat exchanger, SLS1, suction line, SLCV1, accumulator, and SPR/ETV.
The LLS2 is also open so some of the refrigerant flows through the Zone 2 heat exchanger and expansion valve into the
evaporator. There, liquid refrigerant absorbs heat as it evaporates into low pressure vapor. The refrigerant returns to the
compressor through the heat exchanger, SLS2, suction line, SLCV2, accumulator, and SPR/ETV.
Zone 1 Evaporator
1F. Zone 1 Liquid Line Solenoid (LLS1)-Open/ Energized
2F. Zone 1 Liquid Return Check Valve (LRCV1)-Closed
3F. Zone 1 Suction Line Solenoid (SLS1)-Open/ De-energized
4F. Zone 1 Suction Line Check Valve (SLCV1)-Open
5F. Zone 1 Hot Gas Solenoid (HGS1)-Closed/ De-energized
Zone 2 Evaporator
1R. Zone 2 Liquid Line Solenoid (LLS2)-Open/ Energized
2R. Zone 2 Liquid Return Check Valve (LRCV2)-Closed
3R. Zone 2 Suction Line Solenoid (SLS2)-Open/ De-energized
4R. Zone 2 Suction Line Check Valve (SLCV2)-Open
5R. Zone 2 Hot Gas Solenoid (HGS2)-Closed/ De-energized
Condensing Unit
6. Condenser Inlet Solenoid (CIS)-Open/ De-energized
7. Condenser Check Valve (CCV)-Open
8. Receiver Tank Pressure Solenoid (RTPS)-Closed/De-energized
9. Purge Valve (PV)-Closed/De-energized
10. Purge Check Valve (PCV)-Closed
Solenoid Delays
HGS Delay – When there is a requirement for the CIS valve to open (de-energize) and a HGS to close (de-energize), the HGS
will delay closing (de-energizing) for 5 seconds.
Содержание T-1000R
Страница 14: ...Safety Precautions 2 6 Warning Decals 2e24151g0 ...
Страница 18: ...Specifications 3 4 ENGINE CLUTCH Engagement 600 100 RPM Dynamic Torque 66 fT lb 89 5 N m minimum 1600 RPM ...
Страница 34: ...Maintenance Inspection Schedule 4 10 ...
Страница 57: ...Unit Description 5 23 Purge Mode UT Series 1 3 4 5 2 ...
Страница 67: ...Unit Description 5 33 Zone 1 Cool and Zone 2 Cool UT SPECTRUM Units ...
Страница 69: ...Unit Description 5 35 Purge Mode UT SPECTRUM Units ...
Страница 71: ...Unit Description 5 37 Zone 1 Cool and Zone 2 Heat UT SPECTRUM Units ...
Страница 72: ...Unit Description 5 38 ...
Страница 74: ...Diesel Electric Menu 6 28 Adjust Brightness 6 29 Time 6 30 ...
Страница 120: ...Operating Instructions Standard HMI 7 18 ...
Страница 152: ...Engine Maintenance 9 14 T Series Fuel and Oil System Components TK 376 ...
Страница 154: ...Engine Maintenance 9 16 T Series Fuel and Oil System Components TK 270 ...
Страница 156: ...Engine Maintenance 9 18 UT Series Fuel System Components AMA768 ...
Страница 172: ...Engine Maintenance 9 34 T Series Engine Mounting Components for 2 Cylinder Engine ...
Страница 184: ...Engine Maintenance 9 46 ...
Страница 238: ...Refrigeration Maintenance 10 54 ...
Страница 246: ...Clutch Maintenance 11 8 ...
Страница 258: ...Structural Maintenance 12 12 ...
Страница 264: ...Mechanical Diagnosis 13 6 ...
Страница 265: ...14 Electric Standby Diagnosis ...
Страница 268: ...Electric Standby Diagnosis 14 4 ...
Страница 269: ...15 Refrigeration System Diagnosis ...
Страница 272: ...Refrigeration System Diagnosis 15 4 ...
Страница 280: ...Remote Evaporators 16 8 ...
Страница 282: ...Wiring Diagrams and Wiring Schematics 17 2 ...