Refrigeration Maintenance
10-38
3. Push the piston into the piston nut until the end of the rectangular shaft is about even with the top of the piston nut.
4. Make sure the copper washer is in place in the top of the piston nut.
5. Place the threaded shaft of the stepper motor into the rectangular shaft of the piston and turn the piston and piston nut onto
the threaded shaft of the stepper motor.
6. When the threads in the top of piston nut reach the threads on the bottom of the stepper motor, carefully continue to turn the
piston and piston nut onto the stepper motor. Make sure that the copper washer is in place and take care to avoid cross
threading the fine threads on the stepper motor and in the top of the piston nut.
7. Continue to turn the piston and piston nut onto the stepper motor until they are tight. Torque the piston nut and stepper motor
to 37 fT-lb (50 N•m).
Installation of Complete ETV Assembly
1. Clean the tubes for soldering.
2. Place the new complete ETV assembly (and any tubes that were removed) in the same position from which the old one was
removed and install the ETV mounting hardware. The ETV assembly must be installed as shown below relative to the
direction of refrigerant flow from the accumulator to the compressor.
NOTE: Do not disassemble the new ETV to solder it in place.
3. Use a heat sink or wrap the valve body with a wet rag to prevent damage and solder the tubing connections with 95-5 soft
solder.
4. Connect the ETV harness to the main wire harness at the four-pin connector.
5. Pressurize the low side and test for leaks.
6. If no leaks are found, replace the liquid line drier then evacuate the low side.
7. Open the refrigeration valves and place the unit in operation.
8. Test the unit to see that the ETV is properly installed.
1.
Position End of Rectangular Shaft
about Even with Top of Piston Nut
Push Piston into Piston Nut
1.
Use Heat Sink
2.
Direction of Refrigerant Flow
Installing Complete ETV Assembly (Old Style Shown, New Style Similar)
1
1
2
Содержание T-1000R
Страница 14: ...Safety Precautions 2 6 Warning Decals 2e24151g0 ...
Страница 18: ...Specifications 3 4 ENGINE CLUTCH Engagement 600 100 RPM Dynamic Torque 66 fT lb 89 5 N m minimum 1600 RPM ...
Страница 34: ...Maintenance Inspection Schedule 4 10 ...
Страница 57: ...Unit Description 5 23 Purge Mode UT Series 1 3 4 5 2 ...
Страница 67: ...Unit Description 5 33 Zone 1 Cool and Zone 2 Cool UT SPECTRUM Units ...
Страница 69: ...Unit Description 5 35 Purge Mode UT SPECTRUM Units ...
Страница 71: ...Unit Description 5 37 Zone 1 Cool and Zone 2 Heat UT SPECTRUM Units ...
Страница 72: ...Unit Description 5 38 ...
Страница 74: ...Diesel Electric Menu 6 28 Adjust Brightness 6 29 Time 6 30 ...
Страница 120: ...Operating Instructions Standard HMI 7 18 ...
Страница 152: ...Engine Maintenance 9 14 T Series Fuel and Oil System Components TK 376 ...
Страница 154: ...Engine Maintenance 9 16 T Series Fuel and Oil System Components TK 270 ...
Страница 156: ...Engine Maintenance 9 18 UT Series Fuel System Components AMA768 ...
Страница 172: ...Engine Maintenance 9 34 T Series Engine Mounting Components for 2 Cylinder Engine ...
Страница 184: ...Engine Maintenance 9 46 ...
Страница 238: ...Refrigeration Maintenance 10 54 ...
Страница 246: ...Clutch Maintenance 11 8 ...
Страница 258: ...Structural Maintenance 12 12 ...
Страница 264: ...Mechanical Diagnosis 13 6 ...
Страница 265: ...14 Electric Standby Diagnosis ...
Страница 268: ...Electric Standby Diagnosis 14 4 ...
Страница 269: ...15 Refrigeration System Diagnosis ...
Страница 272: ...Refrigeration System Diagnosis 15 4 ...
Страница 280: ...Remote Evaporators 16 8 ...
Страница 282: ...Wiring Diagrams and Wiring Schematics 17 2 ...