15
ENGLISH
To move the boiler manually, proceed as follows:
- Unscrew the screws (1) securing the boiler to the pallet;
- Remove the top panel (2);
- lift the boiler using the brackets provided in the body;
Use lifting equipment suitable for the weight involved.
1
1
2
b
Take care because the boiler might swing when lifted.
Installation premises
The thermal unit
ACQUAHOME R BLU
must be installed in
rooms with appropriately sized vent openings which comply
with the Technical Standards and Regulations in force in the
place of installation.
b
When installing the boiler, allow sufficient space around
it to access all safety and control devices and to permit
easy maintenance.
b
Check that the electric protection level of the appliance
is suitable for features of the room where it is installed.
b
Make sure that comburent air is not contaminated by
substances containing chlorine or fluorine (elements
found in sprays, paints, detergents etc.).
a
These boilers must be installed indoors. They are not de-
signed for outside use.
a
Do not obstruct or restrict the air vents in the room where
the boiler is installed. A free air supply is essential for
correct combustion.
Recommended minimum distances
This figure shows the minimum installation distances that must
be respected in order to allow proper maintenance of the boil-
er.
≥ 1 m
≥ 1 m
≥ 1 m
≥ 0,5 m
≥ 0,5 m
Installation in older systems and systems
requiring modernisation
When installing these boilers in older systems or systems re-
quiring modernisation, always perform the following checks:
- Make sure that the flue is able to withstand the tem-
perature of the combustion gases and that it has been
designed and made in compliance with applicable
standards. The flue must also be as straight as possi-
ble, sealed, insulated and not blocked or choked
- Make sure that the electrical supply system has been
installed by a qualified electrician in compliance with
applicable standards
- Make sure that the fuel feed line and any storage tank
are made and installed in compliance with applicable
standards
- Make sure that expansion vessels are big enough to
contain the additional volume generated by thermal ex-
pansion
- Make sure that the flow rate, head and direction of flow
of the pumps are suitable and correct
- Make sure that the central heating circuit has been
flushed out to remove all sludge and lime scale, and
that it has been bled and seal tested
- Make sure that a suitable water treatment system is in-
stalled if the quality of the supply/recirculation water so
demands. (Refer to the reference values on page 20);
See
T
’s Catalogue
b
The manufacturer declines all responsibility for damage
caused by incorrectly constructed flue systems.