
FABRICATOR 210
7-14
June 19, 2006
7.17 Main Transformer Test
Disconnect the secondary of the Main Transformer T2 from the rectifier bridge and measure output voltage between
the two transformer output connections as follows:
COARSE VOLTAGE SELECTION
FINE VOLTAGE SELECTOR
VOLTAGE AC (approx.)
SWITCH SETTING
SWITCH SETTING
1
1
13.3
1
2
13.9
1
3
14.4
1
4
15.1
2
1
15.8
2
2
16.6
2
3
17.4
2
4
18.3
3
1
19.3
3
2
20.4
3
3
21.6
3
4
23.1
4
1
24.6
4
2
26.5
4
3
28.7
4
4
31.2
Содержание A-07360
Страница 2: ......
Страница 36: ...FABRICATOR 210 3 16 June 19 2006 NOTES...
Страница 49: ...FABRICATOR 210 June 19 2006 4 13 THIS PAGE HAS BEEN LEFT INTENTIONALLY BLANK...
Страница 52: ...FABRICATOR 210 4 16 June 19 2006 NOTES...
Страница 60: ...FABRICATOR 210 6 6 June 19 2006...
Страница 78: ...FABRICATOR 210 8 4 June 19 2006...
Страница 88: ...FABRICATOR 210 9 10 June 19 2006...
Страница 94: ...FABRICATOR 210 A 6 June 19 2006 APPENDIX 5 MAIN PCB CIRCUIT DIAGRAM 30 VAC Art A 07520...
Страница 96: ...FABRICATOR 210 A 8 June 19 2006 APPENDIX 6 SPOT TIMER CIRCUIT DIAGRAM Art A 07521...
Страница 100: ......