![Texecom Veritas 8 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/texecom/veritas-8/veritas-8_installation-manual_1097259016.webp)
Installation
16
INS 034-9
2.6
Servicing the System
ALWAYS Ensure the mains is off BEFORE removing the front cover
1)
The Power light on the control panel is a status indicator for the battery
charging circuit, a steady light meaning normal. A flashing light means
action required -
mains power can still be present
. ALWAYS use a suitable
mains test instrument to confirm that mains power is no longer present.
2)
The transformer and heatsink may be hot during and after use - do NOT
touch.
!
Test the internal sounder, external sounder and strobe as described in section 3.4,
page 24. Perform a Walk Test as described in section 3.5, page 25. Basic Log
events may be viewed by following the procedure described in section 3.14, page
34.
!
If it is necessary to remove the lid, first switch off the mains supply to the control
panel. Ensure that the Power light is flashing, then use a suitable mains test
instrument to confirm mains power is no longer present.
!
Enter the 4 digit Engineer code
++++
and press
,
to access the
Programming Menu and disable 24 Hour zones via the Engineer code. All the
zone lights will illuminate.
!
Remove the screw covers by inserting a screwdriver into the screw cover slot and
turning anti-clockwise whilst applying pressure outwards.
!
Unscrew the lid screws and remove the lid.
!
On completion replace the lid and secure with the lid screws -
do not over-
tighten.
!
Replace the screw covers.
!
Press
-
to leave the Programming Menu. All the zone lights will turn off.
!
Switch on the mains supply to the control panel. The Power light will stop flashing
and stay on continuously.