Chapter 9 – Maintenance
TestEquity 101H Temperature/Humidity Chamber
Page 71
Chapter 9 – Maintenance
Preventive Maintenance Schedule
Daily or As Needed
•
Clean chamber interior and exterior.
•
Listen for abnormal noise or vibration.
Every 2 Months or As Needed
•
Drain the Humidity Reservoir.
Every 3 Months or as Needed
•
Inspect or replace the water recirculation filter cartridge.
Every 6 Months
•
Inspect the door seal.
•
Clean the condenser.
Every 12 Months
•
Inspect the electrical/refrigeration compartment.
•
Verify the chamber performance.
•
Verify the calibration.
Содержание 101H
Страница 2: ......
Страница 6: ......
Страница 12: ......
Страница 42: ......
Страница 66: ......
Страница 70: ......
Страница 86: ......
Страница 88: ......
Страница 89: ...Chapter 11 Drawings TestEquity 101H Temperature Humidity Chamber Page 89 Chapter 11 Drawings...
Страница 90: ......
Страница 91: ...Electrical Subpanel Component Location R1...