![Terex TA30 Скачать руководство пользователя страница 184](http://html1.mh-extra.com/html/terex/ta30/ta30_maintenance-manual_1088893184.webp)
Section 180-0020
Suspension System - Front Suspension
SM 1979 4-00
2
REMOVAL
Numbers in parentheses refer to Fig. 1.
WARNING
To prevent personal injury and property
damage, be sure wheel blocks, blocking
materials and lifting equipment are properly
secured and of adequate capacity to do the job
safely.
1. Position the vehicle in a level work area, lower body
completely, apply the parking brake and switch off the
engine.
2. Block rear wheels, place the steering lock bar and
oscillation lock pin in the 'Locked position and the
battery master switch in the 'Off' position.
3. Whilst the front road wheels are still on the ground,
loosen the wheel nuts.
4. Using suitable lifting equipment, raise the tractor
frame until both front tyres are off the ground. Support
the vehicle with suitable stands and blocking
equipment at the front frame and articulation pivot
area.
5. Support one tyre and rim assembly with suitable
lifting equipment and remove wheel nuts and
lockwashers securing the rim to the axle. Remove tyre
and rim assembly from the machine.
6. Repeat Step 5 for the opposite tyre and rim
assembly.
7. Disconnect nylon tubes from air spring assemblies
(22).
8. Jack up suspension frame (10) to allow removal of
shock absorbers (1), air spring assemblies (22), chain
(34) and levelling valve (36).
9. Remove locknuts (4), washers (3) and bolts (2)
securing shock absorbers (1) to suspension frame
(10) assembly.
10. Remove nuts (9), lockwasher (35), washers (7)
and bolt (8) securing levelling valve rubber joint (6) to
suspension frame (10) assembly.
11. Remove nut (31) and bolt (32) securing chain (34)
to suspension frame (10) assembly.
12. Remove locknuts (30) securing air spring
assemblies (22) to the front frame assembly.
13. Lower front end of suspension frame (10)
assembly onto a suitable trolley.
14. Using suitable lifting equipment, support rear arms
of suspension frame (10) assembly.
15. Remove bolts (17) and lockwashers (18) securing
mounting pins (13) to the front frame assembly.
Withdraw mounting pins (13) and shims (15 & 21) from
front frame assembly and suspension frame (10)
assembly.
16. Carefully lower suspension frame (10) assembly
onto the trolley and remove suspension frame
assembly out from under the front frame. Remove
wear washers (14) and dowel pins (20) from the front
frame assembly.
17. Remove cap from shock absorber (1) mounting
nuts and remove nuts securing shock absorbers (1) to
the front frame assembly.
18. Remove nut (31) and bolt (32) securing chain (34)
to the front frame.
19. Remove mounting hardware securing levelling
valve (36) to the front frame assembly and remove
levelling valve.
DISASSEMBLY
Numbers in parentheses refer to Fig. 1.
WARNING
To prevent personal injury and property
damage, be sure lifting equipment is properly
secured and of adequate capacity to do the job
safely.
1. Remove locknuts (30) securing air spring
assemblies (22) on suspension frame (10). Refer to
Section 180-0021, AIR SPRING, for further
disassembly, inspection and assembly of air spring
assembly (22).
2. Remove nuts (12), bolts (11), hardened washers
(37) and bent plates (33) securing front axle assembly
on suspension frame (10).
3. Using suitable lifting equipment remove front axle
assembly from suspension frame (10).
Содержание TA30
Страница 2: ...Courtesy of Machine Market ...
Страница 4: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 6: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 12: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 18: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 32: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 46: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 50: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 52: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 60: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 64: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 70: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 98: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 104: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 152: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 164: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 170: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 176: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 182: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 188: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 194: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 200: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 204: ...Section 190 0000 4 SM 1946 4 00 SM 2458A Electrical System Circuit Diagrams Courtesy of Machine Market ...
Страница 205: ...Section 190 0000 SM 1946 4 00 5 SM 2458B Electrical System Circuit Diagrams Courtesy of Machine Market ...
Страница 206: ...Section 190 0000 6 SM 1946 4 00 SM 2458C Electrical System Circuit Diagrams Courtesy of Machine Market ...
Страница 207: ...Section 190 0000 SM 1946 4 00 7 SM 2458D Electrical System Circuit Diagrams Courtesy of Machine Market ...
Страница 208: ...Section 190 0000 8 SM 1946 4 00 SM 2458E Electrical System Circuit Diagrams Courtesy of Machine Market ...
Страница 209: ...Section 190 0000 SM 1946 4 00 9 SM 2458F Electrical System Circuit Diagrams Courtesy of Machine Market ...
Страница 210: ...Section 190 0000 10 SM 1946 4 00 SM 2458G Electrical System Circuit Diagrams Courtesy of Machine Market ...
Страница 211: ...Section 190 0000 SM 1946 4 00 11 SM 2458H Electrical System Circuit Diagrams Courtesy of Machine Market ...
Страница 212: ...Section 190 0000 12 SM 1946 4 00 SM 2458I Electrical System Circuit Diagrams Courtesy of Machine Market ...
Страница 214: ...Section 190 0000 14 SM 1946 4 00 SM 2458K Electrical System Circuit Diagrams Courtesy of Machine Market ...
Страница 240: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 250: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 270: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 280: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 304: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 310: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 320: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 332: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 348: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 352: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 356: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 362: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 394: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...
Страница 402: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market ...