14. Connect the ends of the new belt together
with the new hardware. Check that the bolts
will be running up the conveyor ’head first’
when the conveyor is running normally,
followed by the nuts. Tighten all the splice
nuts until they are snug. The ends of the belt
should extrude slightly between the splice
plates.
15.Adjust the belt tension springs until they are
both compressed to a length of 178 mm
(7 inches).
16.Run the conveyor at slow speed and check
the tracking of the new conveyor belt. Adjust
the new belt as necessary. See the TO
ADJUST THE CONVEYOR BELT
TRACKING section of the manual.
17.Reassemble the brush drive, shrouds and
skids. See the TO REPLACE THE MAIN
BRUSH section of the manual.
18.Over the next ten hours of operation, check
the tension spring length and belt tracking
periodically. The spring tension should be
maintained at 178 to 190 mm
(7 to 7.5 inches).
Содержание CENTURION
Страница 1: ...CENTURIONr Operator Manual 002001 331020 Rev 02 331020 ...
Страница 76: ...MAINTENANCE Centurion 331020 11 03 74 MAINTENANCE 1 3 4 5 6 6 7 7 8 8 5 10 10 2 2 9 9 11 11 12 13 14 15 16 ...
Страница 134: ...SPECIFICATIONS Centurion 331020 7 04 132 ...
Страница 142: ...INDEX Centurion 331020 9 05 140 ...