83
Example 2: Dual set point/PID
A heat treating furnace is required to harden the mold at a high temperature (1000°C) for 30 minutes, then the mold is
cooled down with a programmable ramp (20°C/minute) to a lower set point (200°C). Use the dual set point/PID and
ramp/dwell functions for this application.
1. Set the following parameters in the setup menu:
FUNC=FULL
A1FN=TIMR
EIFN=SP.P2
PVMD=PV1
SPMD=MINR
2. Adjust the following parameters in the user menu:
TIME=30.0 (minutes)
RAMP=20.0 (°C/minute)
SP1=1000°C
SP2=200°C
PL1=100(%)
3. Set the proper values for PB1, TI1, TD1, PB2, TI2, and TD2 directly according to previous records. For a new
system, tune the first PID set at SP1=800°C and tune the second PID set at SP2=400°C.
The circuit diagram is the same as shown in figure 5.14. The temperature profile is shown below:
Содержание TEC-2500
Страница 2: ...NOTES...
Страница 4: ...NOTES...
Страница 10: ...6...
Страница 11: ...7 1 5 Menu Overview...
Страница 13: ...9 1 7 Parameter Description...
Страница 14: ...10...
Страница 16: ...12...
Страница 17: ...13...
Страница 18: ...14...
Страница 19: ...15...
Страница 20: ...16 NOTES...
Страница 25: ...21 2 9 CT Heater Current Input Wiring...
Страница 27: ...23 2 11 Output 1 Wiring Continued...
Страница 29: ...25...
Страница 31: ...27 2 14 Alarm 2 Wiring...
Страница 32: ...28 2 15 RS 485...
Страница 34: ...30 2 17 Analog Retransmission...
Страница 35: ...31 2 18 Programming Port See figure 1 3 in section 1 3 to find the programming port location...
Страница 36: ...32 NOTES...
Страница 45: ...41 Although the above descriptions are based on alarm 1 the same conditions can be applied to alarm 2...
Страница 94: ...90 NOTES...
Страница 96: ...92...
Страница 97: ...93...
Страница 98: ...94 NOTES...
Страница 101: ...97 A 1 Menu Existence Conditions...
Страница 102: ...98...
Страница 103: ...99...
Страница 104: ...100 A 2 Factory Menu Description...
Страница 105: ...101 A 5 Memo Use the following table as a master copy for your settings page 1 of 2...
Страница 106: ...102...