TALEX Spółka z ograniczoną odpowiedzialnością
Spółka komandytowa
ul. Dworcowa 9c, 77-141 Borzytuchom
tel. (59) 821 13 40
e-mail.
78
Fitting instructions for the metal covers
Eco CUT
Attention!
All bolted joints in steps I - VII should be initially only loosely connected - not tightened.
The final tightening should be done after the cover has been placed on the main frame and
adjusted to the machine - step XI of the covers fitting procedure.
1) Step I
Find a safe and stable place to fit the covers,
Lay out the left and right covers, and the bent reinforcements,
Make sure that the selected holes (Fig. 24, Detail A) are facing the correct way (
the
same direction
).
Figure 25 Step I of the tarpaulin covers assembly
Left cover
Right cover
Bent reinforcement
A
A
Figure 21 Detail A