Drum rotation indicator
1 Drum rotation indicator for the 2nd hoist‐
ing gear
3 Drum rotation indicator for the hoisting
gear
2 Drum rotation indicator rocker switch
The right crane control lever is equipped with a drum rotation indicator for the hoisting gear. The
pulsating vibration indicates the slewing movement of the hoisting gear to the crane driver percepti‐
bly and audibly.
3 Operation
212
ATF 130G-5 2146097
2014-09
Содержание ATF 130G-5
Страница 2: ......
Страница 8: ...Table of Contents 8 ATF 130G 5 2146097 2014 09...
Страница 30: ...2 General safety instructions 30 ATF 130G 5 2146097 2014 09...
Страница 31: ...2 General safety instructions ATF 130G 5 2146097 2014 09 31...
Страница 32: ...2 General safety instructions 32 ATF 130G 5 2146097 2014 09...
Страница 33: ...2 General safety instructions ATF 130G 5 2146097 2014 09 33...
Страница 35: ...219 220 221 222 223 224 227 229 230 231 232 2 General safety instructions ATF 130G 5 2146097 2014 09 35...
Страница 36: ...235 236 251 252 253 255 256 257 258 260 262 263 264 2 General safety instructions 36 ATF 130G 5 2146097 2014 09...
Страница 50: ...2 General safety instructions 50 ATF 130G 5 2146097 2014 09...
Страница 51: ...2 General safety instructions ATF 130G 5 2146097 2014 09 51...
Страница 64: ...2 General safety instructions 64 ATF 130G 5 2146097 2014 09...
Страница 68: ...3 1 3 Operating elements 3 Operation 68 ATF 130G 5 2146097 2014 09...
Страница 101: ...3 Operation ATF 130G 5 2146097 2014 09 101...
Страница 188: ...3 8 2 Outrigger Alarm displays 3 Operation 188 ATF 130G 5 2146097 2014 09...
Страница 191: ...Outrigger control using the CG 1 Cursor control 4 Front left outrigger 3 Operation ATF 130G 5 2146097 2014 09 191...
Страница 193: ...Outrigger control using rocker tip switches and rocker switches 3 Operation ATF 130G 5 2146097 2014 09 193...
Страница 196: ...Fast approach circuit 1 Fast approach circuit switch 3 Operation 196 ATF 130G 5 2146097 2014 09...
Страница 228: ...1 Counterweight cylinder 3 Operation 228 ATF 130G 5 2146097 2014 09...
Страница 229: ...3 Operation ATF 130G 5 2146097 2014 09 229...
Страница 236: ...Counterweight variant 31 7 t 69886 5 lbs 3 Operation 236 ATF 130G 5 2146097 2014 09...
Страница 239: ...Counterweight variant 42 3 t 93255 5 lbs 3 Operation ATF 130G 5 2146097 2014 09 239...
Страница 240: ...Mounting instruction 3 Operation 240 ATF 130G 5 2146097 2014 09...
Страница 466: ...3 Operation 466 ATF 130G 5 2146097 2014 09...
Страница 471: ...Boom 4 Crane testing instructions ATF 130G 5 2146097 2014 09 471...
Страница 472: ...Stinger 4 Crane testing instructions 472 ATF 130G 5 2146097 2014 09...
Страница 473: ...Boom end 4 Crane testing instructions ATF 130G 5 2146097 2014 09 473...
Страница 474: ...Intermediate section 4 Crane testing instructions 474 ATF 130G 5 2146097 2014 09...
Страница 484: ...4 Crane testing instructions 484 ATF 130G 5 2146097 2014 09...
Страница 491: ...5 1 9 Wiring diagram 5 Rectifying the faults ATF 130G 5 2146097 2014 09 491...
Страница 492: ...5 Rectifying the faults 492 ATF 130G 5 2146097 2014 09...
Страница 493: ...5 Rectifying the faults ATF 130G 5 2146097 2014 09 493...
Страница 494: ...5 Rectifying the faults 494 ATF 130G 5 2146097 2014 09...
Страница 502: ...7 Service and Maintenance 502 ATF 130G 5 2146097 2014 09...
Страница 510: ...7 0 General instructions 4 4 ATF130G 5 2010 12 0260_EN_FA046_7_00_00_00_FA036 DOC Notes...
Страница 512: ...7 1 Maintenance intervals 2 14 ATF130G 5 2010 12 G 0265_EN_FA046B_7_01_00_00_FA029 doc Notes...
Страница 521: ...Maintenance intervals 7 1 ATF130G 5 2010 12 0265_EN_FA046B_7_01_00_00_FA029 doc 11 14 Notes...
Страница 522: ......
Страница 523: ...Maintenance intervals 7 1 ATF130G 5 2010 12 0265_EN_FA046B_7_01_00_00_FA029 doc 13 14 Notes...
Страница 524: ...7 1 Maintenance intervals 14 14 ATF130G 5 2010 12 0265_EN_FA046B_7_01_00_00_FA029 doc Notes...
Страница 536: ...7 2 Engine 12 12 ATF130G 5 2013 11 0270_EN_FA046B_7_02_00_00_FA029 ab FZ 066 doc Notes...
Страница 563: ...Electrical system 7 7 ATF130G 5 2010 12 9 12 0295_EN_FA046B_7_07_00_00_FA029 DOC Optional equipment...
Страница 566: ...7 7 Electrical system 12 12 ATF130G 5 2010 12 0295_EN_FA046B_7_07_00_00_FA029 DOC Notes...
Страница 570: ...7 8 Crane cab 4 4 ATF130G 5 2010 12 0300_EN_FA046_7_08_00_00_FA029 DOC Notes...
Страница 580: ...7 10 Compressed air system 6 6 ATF130G 5 2010 12 0307_EN_FA046_7_10_00_00 DOC Notes...
Страница 584: ...7 16 Grease Overview Grease Recommendations 2 2 ATF130G 5 2010 12 0315_EN_FA046_7_16_00_00_FA029 DOC Notes...
Страница 588: ...8 Annex Manufacturer s documents 588 ATF 130G 5 2146097 2014 09...
Страница 602: ...8 Annex Manufacturer s documents 602 ATF 130G 5 2146097 2014 09...
Страница 614: ...8 Annex Manufacturer s documents 614 ATF 130G 5 2146097 2014 09...
Страница 615: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 616: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 617: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 618: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 619: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 620: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 622: ...8 Annex Manufacturer s documents 622 ATF 130G 5 2146097 2014 09...
Страница 630: ...Dolly traveling operation 8 8 ATF130G 5 2012 12 0770_US_FA046_G3_02_00_00_ab_FZ_029_FA036 doc Memo...
Страница 632: ...8 Annex Manufacturer s documents 632 ATF 130G 5 2146097 2014 09...