Correct
Incorrect
The rope socket of the customary rope clamp is attached as follows:
Fix the rope end to the bottom block (in case of the odd number of rope falls) or the boom head (in
case of the even number of rope falls) using a rope clamp.
Since the rope clamp (2) is a connection that is safely closed only under a tensile stress, the free
end of the rope must be secured against pulling even in case of a self-inhibiting rope wedge (3).
Observe the following important instructions:
Always insert the hoisting rope such that the pulling rope runs along the pulling axis of the rope
clamp (A).
If the hoisting rope is inserted incorrectly, it will kink, break and wear out early.
The free end of the rope must be secured using a rope clamp (1).
Do not use any devices for securing if they connect the free end of the rope to the carrying rope fall
such that forces can be transferred.
After pinning the rope clamp on the boom head or the bottom block, increase the load gradually
until the rope wedge reaches its end stop.
Hoisting rope reeving examples
Depending on the required lifting load, determine the bottom block and the required number of rope
falls with the help of "Notes regarding the lifting capacity chart" and the lifting capacity charts.
Reeve the hoisting rope depending on the required number of rope falls as described below:
If possible, the reeving in the bottom block should be done such that the bottom block is suspended
vertically especially in case of a small number of ropes (see the 4-line example).
3 Operation
400
ATF 130G-5 2146097
2014-09
Содержание ATF 130G-5
Страница 2: ......
Страница 8: ...Table of Contents 8 ATF 130G 5 2146097 2014 09...
Страница 30: ...2 General safety instructions 30 ATF 130G 5 2146097 2014 09...
Страница 31: ...2 General safety instructions ATF 130G 5 2146097 2014 09 31...
Страница 32: ...2 General safety instructions 32 ATF 130G 5 2146097 2014 09...
Страница 33: ...2 General safety instructions ATF 130G 5 2146097 2014 09 33...
Страница 35: ...219 220 221 222 223 224 227 229 230 231 232 2 General safety instructions ATF 130G 5 2146097 2014 09 35...
Страница 36: ...235 236 251 252 253 255 256 257 258 260 262 263 264 2 General safety instructions 36 ATF 130G 5 2146097 2014 09...
Страница 50: ...2 General safety instructions 50 ATF 130G 5 2146097 2014 09...
Страница 51: ...2 General safety instructions ATF 130G 5 2146097 2014 09 51...
Страница 64: ...2 General safety instructions 64 ATF 130G 5 2146097 2014 09...
Страница 68: ...3 1 3 Operating elements 3 Operation 68 ATF 130G 5 2146097 2014 09...
Страница 101: ...3 Operation ATF 130G 5 2146097 2014 09 101...
Страница 188: ...3 8 2 Outrigger Alarm displays 3 Operation 188 ATF 130G 5 2146097 2014 09...
Страница 191: ...Outrigger control using the CG 1 Cursor control 4 Front left outrigger 3 Operation ATF 130G 5 2146097 2014 09 191...
Страница 193: ...Outrigger control using rocker tip switches and rocker switches 3 Operation ATF 130G 5 2146097 2014 09 193...
Страница 196: ...Fast approach circuit 1 Fast approach circuit switch 3 Operation 196 ATF 130G 5 2146097 2014 09...
Страница 228: ...1 Counterweight cylinder 3 Operation 228 ATF 130G 5 2146097 2014 09...
Страница 229: ...3 Operation ATF 130G 5 2146097 2014 09 229...
Страница 236: ...Counterweight variant 31 7 t 69886 5 lbs 3 Operation 236 ATF 130G 5 2146097 2014 09...
Страница 239: ...Counterweight variant 42 3 t 93255 5 lbs 3 Operation ATF 130G 5 2146097 2014 09 239...
Страница 240: ...Mounting instruction 3 Operation 240 ATF 130G 5 2146097 2014 09...
Страница 466: ...3 Operation 466 ATF 130G 5 2146097 2014 09...
Страница 471: ...Boom 4 Crane testing instructions ATF 130G 5 2146097 2014 09 471...
Страница 472: ...Stinger 4 Crane testing instructions 472 ATF 130G 5 2146097 2014 09...
Страница 473: ...Boom end 4 Crane testing instructions ATF 130G 5 2146097 2014 09 473...
Страница 474: ...Intermediate section 4 Crane testing instructions 474 ATF 130G 5 2146097 2014 09...
Страница 484: ...4 Crane testing instructions 484 ATF 130G 5 2146097 2014 09...
Страница 491: ...5 1 9 Wiring diagram 5 Rectifying the faults ATF 130G 5 2146097 2014 09 491...
Страница 492: ...5 Rectifying the faults 492 ATF 130G 5 2146097 2014 09...
Страница 493: ...5 Rectifying the faults ATF 130G 5 2146097 2014 09 493...
Страница 494: ...5 Rectifying the faults 494 ATF 130G 5 2146097 2014 09...
Страница 502: ...7 Service and Maintenance 502 ATF 130G 5 2146097 2014 09...
Страница 510: ...7 0 General instructions 4 4 ATF130G 5 2010 12 0260_EN_FA046_7_00_00_00_FA036 DOC Notes...
Страница 512: ...7 1 Maintenance intervals 2 14 ATF130G 5 2010 12 G 0265_EN_FA046B_7_01_00_00_FA029 doc Notes...
Страница 521: ...Maintenance intervals 7 1 ATF130G 5 2010 12 0265_EN_FA046B_7_01_00_00_FA029 doc 11 14 Notes...
Страница 522: ......
Страница 523: ...Maintenance intervals 7 1 ATF130G 5 2010 12 0265_EN_FA046B_7_01_00_00_FA029 doc 13 14 Notes...
Страница 524: ...7 1 Maintenance intervals 14 14 ATF130G 5 2010 12 0265_EN_FA046B_7_01_00_00_FA029 doc Notes...
Страница 536: ...7 2 Engine 12 12 ATF130G 5 2013 11 0270_EN_FA046B_7_02_00_00_FA029 ab FZ 066 doc Notes...
Страница 563: ...Electrical system 7 7 ATF130G 5 2010 12 9 12 0295_EN_FA046B_7_07_00_00_FA029 DOC Optional equipment...
Страница 566: ...7 7 Electrical system 12 12 ATF130G 5 2010 12 0295_EN_FA046B_7_07_00_00_FA029 DOC Notes...
Страница 570: ...7 8 Crane cab 4 4 ATF130G 5 2010 12 0300_EN_FA046_7_08_00_00_FA029 DOC Notes...
Страница 580: ...7 10 Compressed air system 6 6 ATF130G 5 2010 12 0307_EN_FA046_7_10_00_00 DOC Notes...
Страница 584: ...7 16 Grease Overview Grease Recommendations 2 2 ATF130G 5 2010 12 0315_EN_FA046_7_16_00_00_FA029 DOC Notes...
Страница 588: ...8 Annex Manufacturer s documents 588 ATF 130G 5 2146097 2014 09...
Страница 602: ...8 Annex Manufacturer s documents 602 ATF 130G 5 2146097 2014 09...
Страница 614: ...8 Annex Manufacturer s documents 614 ATF 130G 5 2146097 2014 09...
Страница 615: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 616: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 617: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 618: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 619: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 620: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 622: ...8 Annex Manufacturer s documents 622 ATF 130G 5 2146097 2014 09...
Страница 630: ...Dolly traveling operation 8 8 ATF130G 5 2012 12 0770_US_FA046_G3_02_00_00_ab_FZ_029_FA036 doc Memo...
Страница 632: ...8 Annex Manufacturer s documents 632 ATF 130G 5 2146097 2014 09...