
Code
Description
Remedy
W0029
Limit of the working radius is reached
(working range limit).
Exit the working range limit function or
raise the telescopic boom or retract the
telescope.
W0030
Smallest offset angle of the jib LJ or of the
hydraulically adjustable jib is reached.
Lower the jib or raise the boom.
W0034
Rope reserve of hoisting winch 1 is
reached.
Wind hoisting rope of hoisting winch 1.
W0035
Rope reserve of hoisting winch 2 is
reached.
Wind hoisting rope of hoisting winch 2.
W0039
Armrest is folded up.
Fold down the armrest.
W0040
Emergency operating mode
(Emergency telescope switch is set to
ON).
The crane must be operated carefully.
See "Emergency operation".
W0041
Incorrect input signal on the counterweight
transmitter.
—
W0042
Right-hand slew limit reached (working
range limit).
Exit the working range limit function or
slew towards the left.
W0043
Left-hand slew limit reached (working
range limit).
Exit the working range limit function or
slew towards the right.
W0045
The telescope cylinder has reached the
end stop when telescoping in the manual
mode.
Retract the telescope cylinder.
W0054
Luffing cylinder has reached the lower end
stop.
Raise the telescopic boom.
W0055
Luffing cylinder has reached the upper
end stop.
Lower the telescopic boom.
W0056
Another slewing process will lead to an
overload (or an overload condition has al‐
ready occurred) if outriggers are extended
to different levels towards the left and the
right.
(Slow-stop function for slewing operations
is deactivated)
Slew in the opposite direction, retract the
telescope or lift the telescopic boom.
W0057
Front-right outrigger is retracted.
Extend the front-right outrigger.
W0058
Rear-right outrigger is retracted.
Extend the rear-right outrigger.
W0059
Front-left outrigger is retracted.
Extend the front-left outrigger.
W0060
Rear-left outrigger is retracted.
Extend the rear-left outrigger.
W0061
HTLJ is not pinned.
Pin HTLJ with remote control.
W0093
Telescopic boom connecting pin (B-pin) or
telescope cylinder connecting pin (C-pin)
cannot be controlled.
Locking and unlocking sensors for the B-
pin or C-pin are set to "OFF" on both
sides.
Bring the crane control lever back to the
neutral position. Then try again.
When operated, the angle of the telescop‐
ic boom must be > 70°.
When operated with the jib LJ, the angle
of the telescopic boom must be > 75°.
W0094
Telescope cylinder locking bolt (C-pin)
cannot be controlled.
Bring the crane control lever back to the
neutral position. Then try again.
When operated, the angle of the telescop‐
ic boom must be > 70°.
When operated with the jib LJ, the angle
of the telescopic boom must be > 75°.
3 Operation
132
ATF 130G-5 2146097
2014-09
Содержание ATF 130G-5
Страница 2: ......
Страница 8: ...Table of Contents 8 ATF 130G 5 2146097 2014 09...
Страница 30: ...2 General safety instructions 30 ATF 130G 5 2146097 2014 09...
Страница 31: ...2 General safety instructions ATF 130G 5 2146097 2014 09 31...
Страница 32: ...2 General safety instructions 32 ATF 130G 5 2146097 2014 09...
Страница 33: ...2 General safety instructions ATF 130G 5 2146097 2014 09 33...
Страница 35: ...219 220 221 222 223 224 227 229 230 231 232 2 General safety instructions ATF 130G 5 2146097 2014 09 35...
Страница 36: ...235 236 251 252 253 255 256 257 258 260 262 263 264 2 General safety instructions 36 ATF 130G 5 2146097 2014 09...
Страница 50: ...2 General safety instructions 50 ATF 130G 5 2146097 2014 09...
Страница 51: ...2 General safety instructions ATF 130G 5 2146097 2014 09 51...
Страница 64: ...2 General safety instructions 64 ATF 130G 5 2146097 2014 09...
Страница 68: ...3 1 3 Operating elements 3 Operation 68 ATF 130G 5 2146097 2014 09...
Страница 101: ...3 Operation ATF 130G 5 2146097 2014 09 101...
Страница 188: ...3 8 2 Outrigger Alarm displays 3 Operation 188 ATF 130G 5 2146097 2014 09...
Страница 191: ...Outrigger control using the CG 1 Cursor control 4 Front left outrigger 3 Operation ATF 130G 5 2146097 2014 09 191...
Страница 193: ...Outrigger control using rocker tip switches and rocker switches 3 Operation ATF 130G 5 2146097 2014 09 193...
Страница 196: ...Fast approach circuit 1 Fast approach circuit switch 3 Operation 196 ATF 130G 5 2146097 2014 09...
Страница 228: ...1 Counterweight cylinder 3 Operation 228 ATF 130G 5 2146097 2014 09...
Страница 229: ...3 Operation ATF 130G 5 2146097 2014 09 229...
Страница 236: ...Counterweight variant 31 7 t 69886 5 lbs 3 Operation 236 ATF 130G 5 2146097 2014 09...
Страница 239: ...Counterweight variant 42 3 t 93255 5 lbs 3 Operation ATF 130G 5 2146097 2014 09 239...
Страница 240: ...Mounting instruction 3 Operation 240 ATF 130G 5 2146097 2014 09...
Страница 466: ...3 Operation 466 ATF 130G 5 2146097 2014 09...
Страница 471: ...Boom 4 Crane testing instructions ATF 130G 5 2146097 2014 09 471...
Страница 472: ...Stinger 4 Crane testing instructions 472 ATF 130G 5 2146097 2014 09...
Страница 473: ...Boom end 4 Crane testing instructions ATF 130G 5 2146097 2014 09 473...
Страница 474: ...Intermediate section 4 Crane testing instructions 474 ATF 130G 5 2146097 2014 09...
Страница 484: ...4 Crane testing instructions 484 ATF 130G 5 2146097 2014 09...
Страница 491: ...5 1 9 Wiring diagram 5 Rectifying the faults ATF 130G 5 2146097 2014 09 491...
Страница 492: ...5 Rectifying the faults 492 ATF 130G 5 2146097 2014 09...
Страница 493: ...5 Rectifying the faults ATF 130G 5 2146097 2014 09 493...
Страница 494: ...5 Rectifying the faults 494 ATF 130G 5 2146097 2014 09...
Страница 502: ...7 Service and Maintenance 502 ATF 130G 5 2146097 2014 09...
Страница 510: ...7 0 General instructions 4 4 ATF130G 5 2010 12 0260_EN_FA046_7_00_00_00_FA036 DOC Notes...
Страница 512: ...7 1 Maintenance intervals 2 14 ATF130G 5 2010 12 G 0265_EN_FA046B_7_01_00_00_FA029 doc Notes...
Страница 521: ...Maintenance intervals 7 1 ATF130G 5 2010 12 0265_EN_FA046B_7_01_00_00_FA029 doc 11 14 Notes...
Страница 522: ......
Страница 523: ...Maintenance intervals 7 1 ATF130G 5 2010 12 0265_EN_FA046B_7_01_00_00_FA029 doc 13 14 Notes...
Страница 524: ...7 1 Maintenance intervals 14 14 ATF130G 5 2010 12 0265_EN_FA046B_7_01_00_00_FA029 doc Notes...
Страница 536: ...7 2 Engine 12 12 ATF130G 5 2013 11 0270_EN_FA046B_7_02_00_00_FA029 ab FZ 066 doc Notes...
Страница 563: ...Electrical system 7 7 ATF130G 5 2010 12 9 12 0295_EN_FA046B_7_07_00_00_FA029 DOC Optional equipment...
Страница 566: ...7 7 Electrical system 12 12 ATF130G 5 2010 12 0295_EN_FA046B_7_07_00_00_FA029 DOC Notes...
Страница 570: ...7 8 Crane cab 4 4 ATF130G 5 2010 12 0300_EN_FA046_7_08_00_00_FA029 DOC Notes...
Страница 580: ...7 10 Compressed air system 6 6 ATF130G 5 2010 12 0307_EN_FA046_7_10_00_00 DOC Notes...
Страница 584: ...7 16 Grease Overview Grease Recommendations 2 2 ATF130G 5 2010 12 0315_EN_FA046_7_16_00_00_FA029 DOC Notes...
Страница 588: ...8 Annex Manufacturer s documents 588 ATF 130G 5 2146097 2014 09...
Страница 602: ...8 Annex Manufacturer s documents 602 ATF 130G 5 2146097 2014 09...
Страница 614: ...8 Annex Manufacturer s documents 614 ATF 130G 5 2146097 2014 09...
Страница 615: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 616: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 617: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 618: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 619: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 620: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 622: ...8 Annex Manufacturer s documents 622 ATF 130G 5 2146097 2014 09...
Страница 630: ...Dolly traveling operation 8 8 ATF130G 5 2012 12 0770_US_FA046_G3_02_00_00_ab_FZ_029_FA036 doc Memo...
Страница 632: ...8 Annex Manufacturer s documents 632 ATF 130G 5 2146097 2014 09...