5 Raise boom slowly
14 Dump load
6 Lower boom slowly
15 Slew load in this direction
7 Raise boom and hold load
16 Stop everything
8 Lower boom and hold load
17 Stop! End of work movement
9 Extend boom
Grounding
Both the mobile crane and its load may under certain circumstance become electrically charged
during operation. This can occur, for example, while working near strong transmitters or high fre‐
quency systems.
Electric charging is particularly likely to occur if the support plates of the mobile crane consist of
insulating material (plastic) or support plates made of non-insulation material (steel) are supported
by insulating materials (e.g. square timbers).
The load may also become electrically charged (e.g. when using lifting gear made from non-con‐
ducting materials or synthetic coils).
Therefore, it may be necessary to ground the mobile crane and its load. To do this, a conducting
connection must be established between the part to be grounded (mobile crane/load) and the
ground.
Grounding the Mobile Crane
DANGER
Danger to life from electric shock!
There is a danger of electric shock when the mobile crane is not proper‐
ly grounded.
1. Avoid electrostatic charging of the mobile crane.
2. Ground the mobile crane properly.
The mobile crane must be grounded before beginning work:
▪ near high-frequency systems
▪ near transmitters (radio transmitters, television and radio transmitters etc),
To ground the mobile crane, the following are necessary:
▪ if not positioned near the mobile crane, a stable, electrically conducting pole approx. 1 m (3.3
ft) long, which is driven into the ground,
▪ a sufficiently long, electrically conducting cable with at least 16 mm
2
(0.024 in
2
) diameter,
▪ Screw clamps, or nuts and disks for fastening the parts to each other.
Procedure:
1. Drive the grounding rod at least 0.7 m (2.3 foot) into the ground.
2. In order to make the ground around the ground rod more conductive, it must be dampened
well.
The ground resistance depends on the contact surface of the grounding rod and the condition
of the ground material.
2 General safety instructions
ATF 130G-5 2146097
2014-09
53
Содержание ATF 130G-5
Страница 2: ......
Страница 8: ...Table of Contents 8 ATF 130G 5 2146097 2014 09...
Страница 30: ...2 General safety instructions 30 ATF 130G 5 2146097 2014 09...
Страница 31: ...2 General safety instructions ATF 130G 5 2146097 2014 09 31...
Страница 32: ...2 General safety instructions 32 ATF 130G 5 2146097 2014 09...
Страница 33: ...2 General safety instructions ATF 130G 5 2146097 2014 09 33...
Страница 35: ...219 220 221 222 223 224 227 229 230 231 232 2 General safety instructions ATF 130G 5 2146097 2014 09 35...
Страница 36: ...235 236 251 252 253 255 256 257 258 260 262 263 264 2 General safety instructions 36 ATF 130G 5 2146097 2014 09...
Страница 50: ...2 General safety instructions 50 ATF 130G 5 2146097 2014 09...
Страница 51: ...2 General safety instructions ATF 130G 5 2146097 2014 09 51...
Страница 64: ...2 General safety instructions 64 ATF 130G 5 2146097 2014 09...
Страница 68: ...3 1 3 Operating elements 3 Operation 68 ATF 130G 5 2146097 2014 09...
Страница 101: ...3 Operation ATF 130G 5 2146097 2014 09 101...
Страница 188: ...3 8 2 Outrigger Alarm displays 3 Operation 188 ATF 130G 5 2146097 2014 09...
Страница 191: ...Outrigger control using the CG 1 Cursor control 4 Front left outrigger 3 Operation ATF 130G 5 2146097 2014 09 191...
Страница 193: ...Outrigger control using rocker tip switches and rocker switches 3 Operation ATF 130G 5 2146097 2014 09 193...
Страница 196: ...Fast approach circuit 1 Fast approach circuit switch 3 Operation 196 ATF 130G 5 2146097 2014 09...
Страница 228: ...1 Counterweight cylinder 3 Operation 228 ATF 130G 5 2146097 2014 09...
Страница 229: ...3 Operation ATF 130G 5 2146097 2014 09 229...
Страница 236: ...Counterweight variant 31 7 t 69886 5 lbs 3 Operation 236 ATF 130G 5 2146097 2014 09...
Страница 239: ...Counterweight variant 42 3 t 93255 5 lbs 3 Operation ATF 130G 5 2146097 2014 09 239...
Страница 240: ...Mounting instruction 3 Operation 240 ATF 130G 5 2146097 2014 09...
Страница 466: ...3 Operation 466 ATF 130G 5 2146097 2014 09...
Страница 471: ...Boom 4 Crane testing instructions ATF 130G 5 2146097 2014 09 471...
Страница 472: ...Stinger 4 Crane testing instructions 472 ATF 130G 5 2146097 2014 09...
Страница 473: ...Boom end 4 Crane testing instructions ATF 130G 5 2146097 2014 09 473...
Страница 474: ...Intermediate section 4 Crane testing instructions 474 ATF 130G 5 2146097 2014 09...
Страница 484: ...4 Crane testing instructions 484 ATF 130G 5 2146097 2014 09...
Страница 491: ...5 1 9 Wiring diagram 5 Rectifying the faults ATF 130G 5 2146097 2014 09 491...
Страница 492: ...5 Rectifying the faults 492 ATF 130G 5 2146097 2014 09...
Страница 493: ...5 Rectifying the faults ATF 130G 5 2146097 2014 09 493...
Страница 494: ...5 Rectifying the faults 494 ATF 130G 5 2146097 2014 09...
Страница 502: ...7 Service and Maintenance 502 ATF 130G 5 2146097 2014 09...
Страница 510: ...7 0 General instructions 4 4 ATF130G 5 2010 12 0260_EN_FA046_7_00_00_00_FA036 DOC Notes...
Страница 512: ...7 1 Maintenance intervals 2 14 ATF130G 5 2010 12 G 0265_EN_FA046B_7_01_00_00_FA029 doc Notes...
Страница 521: ...Maintenance intervals 7 1 ATF130G 5 2010 12 0265_EN_FA046B_7_01_00_00_FA029 doc 11 14 Notes...
Страница 522: ......
Страница 523: ...Maintenance intervals 7 1 ATF130G 5 2010 12 0265_EN_FA046B_7_01_00_00_FA029 doc 13 14 Notes...
Страница 524: ...7 1 Maintenance intervals 14 14 ATF130G 5 2010 12 0265_EN_FA046B_7_01_00_00_FA029 doc Notes...
Страница 536: ...7 2 Engine 12 12 ATF130G 5 2013 11 0270_EN_FA046B_7_02_00_00_FA029 ab FZ 066 doc Notes...
Страница 563: ...Electrical system 7 7 ATF130G 5 2010 12 9 12 0295_EN_FA046B_7_07_00_00_FA029 DOC Optional equipment...
Страница 566: ...7 7 Electrical system 12 12 ATF130G 5 2010 12 0295_EN_FA046B_7_07_00_00_FA029 DOC Notes...
Страница 570: ...7 8 Crane cab 4 4 ATF130G 5 2010 12 0300_EN_FA046_7_08_00_00_FA029 DOC Notes...
Страница 580: ...7 10 Compressed air system 6 6 ATF130G 5 2010 12 0307_EN_FA046_7_10_00_00 DOC Notes...
Страница 584: ...7 16 Grease Overview Grease Recommendations 2 2 ATF130G 5 2010 12 0315_EN_FA046_7_16_00_00_FA029 DOC Notes...
Страница 588: ...8 Annex Manufacturer s documents 588 ATF 130G 5 2146097 2014 09...
Страница 602: ...8 Annex Manufacturer s documents 602 ATF 130G 5 2146097 2014 09...
Страница 614: ...8 Annex Manufacturer s documents 614 ATF 130G 5 2146097 2014 09...
Страница 615: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 616: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 617: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 618: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 619: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 620: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 622: ...8 Annex Manufacturer s documents 622 ATF 130G 5 2146097 2014 09...
Страница 630: ...Dolly traveling operation 8 8 ATF130G 5 2012 12 0770_US_FA046_G3_02_00_00_ab_FZ_029_FA036 doc Memo...
Страница 632: ...8 Annex Manufacturer s documents 632 ATF 130G 5 2146097 2014 09...