3.11.2 Crane operation on outriggers
WARNING
Crane control lever improperly actuated.
Very fast lifting, derricking, turning and braking movements can lead to
the load swinging.
1. The larger the load or the greater the boom length, the more careful
the movements should be.
2. Execute the crane work with utmost care.
Check the ground conditions.
Lock the suspension and support the mobile crane such that it is in the horizontal position as pre‐
scribed (follow the spirit levels). Raise the tires completely off the ground.
When extending the outrigger beams to the half outrigger base, the applicable lifting capacity chart
must be used and the correct values must be entered in the automatic safe load indicator.
The weight of the load to be lifted must be determined.
The bottom block and rope falls must be dimensioned adequately.
The permissible values given in the lifting capacity chart must be adhered to.
Weights of the bottom block, slinging ropes, cross beams, etc. must be deducted from the lifting
capacity.
The selected lifting capacity chart must be exactly identical to the desired working state.
The wind speed may not overshoot the values specified in the notes regarding the lifting capacity
chart.
The wind contact surface may not overshoot the values specified in the notes regarding the lifting
capacity chart.
The maximum permissible load may not be exceeded.
Crane movements (speeds) must be selected such that jerk-free operations are possible.
Dragging is not allowed.
The load may be lifted and derricked only in the range of permissible values specified in lifting ca‐
pacity charts.
The instruments, warning, indicator and pilot lamps as well as the display of the automatic safe
load indicator must be monitored when operating the crane.
The crane must always be operated with the minimum possible working radius.
Check whether the jib has been mounted correctly and the program of the automatic safe load indi‐
cator is set to the required setup condition.
Overriding outrigger length sensor *)
If the outrigger length sensor is defective, the outrigger base must be entered manually. The outrig‐
ger length sensors must be overridden with the "outrigger length sensor override" key-operated
switch.
3 Operation
ATF 130G-5 2146097
2014-09
413
Содержание ATF 130G-5
Страница 2: ......
Страница 8: ...Table of Contents 8 ATF 130G 5 2146097 2014 09...
Страница 30: ...2 General safety instructions 30 ATF 130G 5 2146097 2014 09...
Страница 31: ...2 General safety instructions ATF 130G 5 2146097 2014 09 31...
Страница 32: ...2 General safety instructions 32 ATF 130G 5 2146097 2014 09...
Страница 33: ...2 General safety instructions ATF 130G 5 2146097 2014 09 33...
Страница 35: ...219 220 221 222 223 224 227 229 230 231 232 2 General safety instructions ATF 130G 5 2146097 2014 09 35...
Страница 36: ...235 236 251 252 253 255 256 257 258 260 262 263 264 2 General safety instructions 36 ATF 130G 5 2146097 2014 09...
Страница 50: ...2 General safety instructions 50 ATF 130G 5 2146097 2014 09...
Страница 51: ...2 General safety instructions ATF 130G 5 2146097 2014 09 51...
Страница 64: ...2 General safety instructions 64 ATF 130G 5 2146097 2014 09...
Страница 68: ...3 1 3 Operating elements 3 Operation 68 ATF 130G 5 2146097 2014 09...
Страница 101: ...3 Operation ATF 130G 5 2146097 2014 09 101...
Страница 188: ...3 8 2 Outrigger Alarm displays 3 Operation 188 ATF 130G 5 2146097 2014 09...
Страница 191: ...Outrigger control using the CG 1 Cursor control 4 Front left outrigger 3 Operation ATF 130G 5 2146097 2014 09 191...
Страница 193: ...Outrigger control using rocker tip switches and rocker switches 3 Operation ATF 130G 5 2146097 2014 09 193...
Страница 196: ...Fast approach circuit 1 Fast approach circuit switch 3 Operation 196 ATF 130G 5 2146097 2014 09...
Страница 228: ...1 Counterweight cylinder 3 Operation 228 ATF 130G 5 2146097 2014 09...
Страница 229: ...3 Operation ATF 130G 5 2146097 2014 09 229...
Страница 236: ...Counterweight variant 31 7 t 69886 5 lbs 3 Operation 236 ATF 130G 5 2146097 2014 09...
Страница 239: ...Counterweight variant 42 3 t 93255 5 lbs 3 Operation ATF 130G 5 2146097 2014 09 239...
Страница 240: ...Mounting instruction 3 Operation 240 ATF 130G 5 2146097 2014 09...
Страница 466: ...3 Operation 466 ATF 130G 5 2146097 2014 09...
Страница 471: ...Boom 4 Crane testing instructions ATF 130G 5 2146097 2014 09 471...
Страница 472: ...Stinger 4 Crane testing instructions 472 ATF 130G 5 2146097 2014 09...
Страница 473: ...Boom end 4 Crane testing instructions ATF 130G 5 2146097 2014 09 473...
Страница 474: ...Intermediate section 4 Crane testing instructions 474 ATF 130G 5 2146097 2014 09...
Страница 484: ...4 Crane testing instructions 484 ATF 130G 5 2146097 2014 09...
Страница 491: ...5 1 9 Wiring diagram 5 Rectifying the faults ATF 130G 5 2146097 2014 09 491...
Страница 492: ...5 Rectifying the faults 492 ATF 130G 5 2146097 2014 09...
Страница 493: ...5 Rectifying the faults ATF 130G 5 2146097 2014 09 493...
Страница 494: ...5 Rectifying the faults 494 ATF 130G 5 2146097 2014 09...
Страница 502: ...7 Service and Maintenance 502 ATF 130G 5 2146097 2014 09...
Страница 510: ...7 0 General instructions 4 4 ATF130G 5 2010 12 0260_EN_FA046_7_00_00_00_FA036 DOC Notes...
Страница 512: ...7 1 Maintenance intervals 2 14 ATF130G 5 2010 12 G 0265_EN_FA046B_7_01_00_00_FA029 doc Notes...
Страница 521: ...Maintenance intervals 7 1 ATF130G 5 2010 12 0265_EN_FA046B_7_01_00_00_FA029 doc 11 14 Notes...
Страница 522: ......
Страница 523: ...Maintenance intervals 7 1 ATF130G 5 2010 12 0265_EN_FA046B_7_01_00_00_FA029 doc 13 14 Notes...
Страница 524: ...7 1 Maintenance intervals 14 14 ATF130G 5 2010 12 0265_EN_FA046B_7_01_00_00_FA029 doc Notes...
Страница 536: ...7 2 Engine 12 12 ATF130G 5 2013 11 0270_EN_FA046B_7_02_00_00_FA029 ab FZ 066 doc Notes...
Страница 563: ...Electrical system 7 7 ATF130G 5 2010 12 9 12 0295_EN_FA046B_7_07_00_00_FA029 DOC Optional equipment...
Страница 566: ...7 7 Electrical system 12 12 ATF130G 5 2010 12 0295_EN_FA046B_7_07_00_00_FA029 DOC Notes...
Страница 570: ...7 8 Crane cab 4 4 ATF130G 5 2010 12 0300_EN_FA046_7_08_00_00_FA029 DOC Notes...
Страница 580: ...7 10 Compressed air system 6 6 ATF130G 5 2010 12 0307_EN_FA046_7_10_00_00 DOC Notes...
Страница 584: ...7 16 Grease Overview Grease Recommendations 2 2 ATF130G 5 2010 12 0315_EN_FA046_7_16_00_00_FA029 DOC Notes...
Страница 588: ...8 Annex Manufacturer s documents 588 ATF 130G 5 2146097 2014 09...
Страница 602: ...8 Annex Manufacturer s documents 602 ATF 130G 5 2146097 2014 09...
Страница 614: ...8 Annex Manufacturer s documents 614 ATF 130G 5 2146097 2014 09...
Страница 615: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 616: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 617: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 618: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 619: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 620: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Страница 622: ...8 Annex Manufacturer s documents 622 ATF 130G 5 2146097 2014 09...
Страница 630: ...Dolly traveling operation 8 8 ATF130G 5 2012 12 0770_US_FA046_G3_02_00_00_ab_FZ_029_FA036 doc Memo...
Страница 632: ...8 Annex Manufacturer s documents 632 ATF 130G 5 2146097 2014 09...