![Symmetricom TimeAnalyzer 7500 Скачать руководство пользователя страница 28](http://html.mh-extra.com/html/symmetricom/timeanalyzer-7500/timeanalyzer-7500_user-manual_1419617028.webp)
26
TimeAnalyzer 7x00 User’s Guide
098-00208-000 Revision A – February, 2010
Chapter 2 Setting Up
Making Power and Ground Connections
The connectors on the Power Distribution Panel are each labeled for use with a
specific module. (Unused connectors have plugs inserted for safety.) To further
ensure that the proper connector is used for each module, the pin-outs are different
for each connector. See
for a view of the connector pins . See
for pin-outs for each module. While the TP5000 cable can be plugged into the
TimeWatch connector on the Power Distribution Panel, the connector and cable are
wired such that no power will be provided to the device.
Figure 2-7.
TimeAnalyzer - Power Connections - Front View
Figure 2-8.
DC Power Cables