A-96.250.451 / 190121
AMI Deltacon Power
Installation
19
3.3.2
FEP Tube at Sample Outlet
1/2” Tube at waste funnel.
Connect the 1/2” tube [C] to the hose nozzle [B] and place it into a
drain with atmospheric pressure.
A
B
C
Stainless steel tube
Union nut
Compression ferrule
D
E
F
Compression cone
Body
Tightened connection
12
3
9
6
A
B
C D
E
F
A
B
C
Waste funnel
Hose nozzle
1/2” tube
A
B
C