
A-96.250.671 / 070222
AMI Silica
Installation
21
3.3. Install the Constant Head
1
Push the overflow tube [C] through the flow cell block [E] as far
as it ends the waste funnel.
2
Fit the constant head tube [B] into the flow cell block [E].
3
Put the constant head cover [A] onto the constant head tube.
4
Adjust the overflow tube [C] so that it is at the lower level mark.
A
B
C
D
E
F
G
Constant head cover
Constant head tube
Overflow tube
O-Ring
Flow cell block
Flow regulating valve
Solenoid valve
Level
A
B
C
E
G
F
D