A-96.250.881 / 070622
AMI Codes-II O3
Maintenance
45
6.3.1
Reagents for measuring Ozone
Prepare
Oxycon
On-line DPD
1
Rinse the canister [E] labelled OXYCON ON LINE DPD Reagent
with demineralized water.
2
Fill the canister up to the 2 liter mark with demineralized water.
3
Slowly pour the content of a bottle of concentrate Oxycon On-line
DPD into the canister.
Avoid splashing!
4
Close the canister with the screw cover and tighten it well.
5
Mix the demineralized water and the reagents well.
6
Put the canister [E] into the holder [G].
7
Remove the screw cover, insert the suction lance [A] and tighten
the screw cover.
Prepare
Oxycon
On-line Buffer
O3
1
Rinse the canister [F] labelled OXYCON ON LINE Ozone Re
-
agent with demineralized water.
2
Fill the canister up to the 2 liter mark with demineralized water.
3
Slowly pour the content of one bag of Oxycon On-line Buffer 03
into the canister.
4
Close the canister with the screw cover and tighten it well.
5
Mix the demineralized water and the reagents well.
6
Put the canister [F] into the holder [G].
7
Remove the screw cover, insert the suction lance [B] and tighten
the screw cover.
Start-up
1
Fill or Flush Reagent System, p. 35.
2
Reset the reagent expiry counter in menu 3.2.3.3
<Maintenance>\<Service>\<Reagents>\<Change reagents>\
<yes>.