Continuity check
1) Measure resistance between connector terminals at both
ends of the circuit being checked (between A-1 and C-1 in
the figure). If no continuity is indicated (infinity or over limit),
that means that the circuit is open between terminals A-1
and C-1.
2) Disconnect the connector included in the circuit (connector-B
in the figure) and measure resistance between terminals A-1
and B-1.
If no continuity is indicated, that means that the circuit is
open between terminals A-1 and B-1. If continuity is indi-
cated, there is an open circuit between terminals B-1 and C-
1 or an abnormality in connector-B.
Voltage check
If voltage is supplied to the circuit being checked, voltage check
can be used as circuit check.
1) With all connectors connected and voltage applied to the cir-
cuit being checked, measure voltage between each terminal
and body ground.
a) If measurements were taken as shown in the figure and
results were as listed below, it means that the circuit is open
between terminals B-1 and A-1.
Voltage between
C-1 and body ground: Approx. 5 V
B-1 and body ground: Approx. 5 V
A-1 and body ground: 0 V
b) Also, if measured values were as listed below, it means that
there is a resistance (abnormality) of such level that corre-
sponds to the voltage drop in the circuit between terminals
A-1 and B-1.
Voltage between
C-1 and body ground: Approx. 5 V
B-1 and body ground: Approx. 5 V
A-1 and body ground: Approx. 3 V
Содержание Wagon R Plus RB310
Страница 3: ......
Страница 5: ......
Страница 57: ...0B 24 MAINTENANCE AND LUBRICATION...
Страница 65: ...1B 8 AIR CONDITIONING OPTIONAL...
Страница 91: ...3D 16 FRONT SUSPENSION...
Страница 141: ...4A 20 FRONT DRIVE SHAFT G10 M13 ENGINES...
Страница 153: ...5 6 BRAKES...
Страница 163: ...5B 6 FRONT BRAKE...
Страница 290: ...ENGINE GENERAL INFORMATION AND DIAGNOSIS M13 ENGINE 6 2 115 A Fig 1 for Step 3 B Fig 3 for Step 8 C Fig 2 for Step 7...
Страница 294: ...ENGINE GENERAL INFORMATION AND DIAGNOSIS M13 ENGINE 6 2 119 A Fig 1 for Step 3 B Fig 3 for Step 8 C Fig 2 for Step 7...
Страница 308: ...ENGINE GENERAL INFORMATION AND DIAGNOSIS M13 ENGINE 6 2 133 A Fig 1 for Step 5 B Fig 2 for Step 9...
Страница 418: ...ENGINE MECHANICAL M13 ENGINE 6A2 79 Main Bearings Crankshaft and Cylinder Block Components...
Страница 435: ...6A2 96 ENGINE MECHANICAL M13 ENGINE...
Страница 457: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM M13 ENGINE Engine and Emission Control System Flow Diagram...
Страница 519: ...6H 4 CHARGING SYSTEM G10 M13 ENGINES...
Страница 539: ...7A2 16 MANUAL TRANSAXLE M13 ENGINE Transaxle Case Components...
Страница 553: ...7A2 30 MANUAL TRANSAXLE M13 ENGINE Input Counter Shaft Components...
Страница 576: ...AUTOMATIC TRANSAXLE M13 ENGINE 7B1 7 Table of Component Operation...
Страница 690: ...AUTOMATIC TRANSAXLE M13 ENGINE 7B1 121...
Страница 789: ...7C 14 CLUTCH G10 M13 ENGINES...
Страница 797: ...7D 8 TRANSFER...
Страница 821: ...8B 4 LIGHTING SYSTEM...
Страница 827: ...8C 6 INSTRUMENTATION DRIVER INFORMATION...
Страница 839: ...8G 12 IMMOBILIZER CONTROL SYSTEM G10 M13 ENGINES...
Страница 845: ...9 6 BODY SERVICE...
Страница 846: ...Prepared by 1st Ed August 2003 Printed in Japan 844...