PERIODIC MAINTENANCE 2-15
THROTTLE CABLE PLAY
• Adjust the throttle cable play
"
as follows.
• Loosen the lock-nut
of the throttle pulling cable
.
• Turn the adjuster
in or out until the throttle cable play (at
the throttle grip)
"
is between 2.0 – 4.0 mm (0.08 – 0.16 in).
• Tighten the lock-nut
while holding the adjuster
.
Throttle cable play
"
: 2.0 – 4.0 mm (0.08 – 0.16 in)
#
Inspect initially at 1 000 km (600 miles, 2 months) and
every 6 000 km (4 000 miles, 12 months) thereafter.
After the adjustment is completed, check that handle-
bar movement does not raise the engine idle speed
and that the throttle grip returns smoothly and auto-
matically.
Содержание GSX-R1000 2007
Страница 1: ...9 9 5 0 0 3 9 3 1 0 0 1 E GSX R1000 PDF processed with CutePDF evaluation edition www CutePDF com...
Страница 43: ...PERIODIC MAINTENANCE 2 31...
Страница 100: ...3 50 ENGINE TRANSMISSION PARTS LOCATION Countershaft Driveshaft...
Страница 153: ...ENGINE 3 103 10 N m 1 0 kgf m 7 0 lb ft 23 N m 2 3 kgf m 16 5 lb ft...
Страница 333: ...7 20 COOLING AND LUBRICATION SYSTEM ENGINE LUBRICATION SYSTEM MAIN GALLERY To sub gallery To sub gallery...
Страница 334: ...COOLING AND LUBRICATION SYSTEM 7 21 To transmission SUB GALLERY MAIN GALLERY VIEW OF A A...
Страница 507: ...SERVICING INFORMATION 10 29 COWLING INSTALLATION B A1 To A To A1 A To B To Radiator heat shield...
Страница 508: ...10 30 SERVICING INFORMATION FRAME COVER INSTALLATION SEAT LOCK CABLE ROUTING...
Страница 514: ...10 36 SERVICING INFORMATION PILLION FOOTREST INSTALLATION Footrest X Apply grease to sliding surface...
Страница 548: ...Prepared by January 2007 Part No 99500 39310 01E Printed in Japan 556...
Страница 549: ...Printed in Japan K7...