EMISSION CONTROL INFORMATION 11-7
• Connect the 12 V battery to the PAIR control solenoid valve
terminals and check the air flow.
• If air does not flow out, the solenoid valve is in normal condi-
tion.
• Check the resistance between the terminals of the PAIR con-
trol solenoid valve.
Resistance: 18 – 22
Ω
at 20 – 30 °C (68 – 86 °F)
\
09900-25008: Multi-circuit tester set
V
Tester knob indication: Resistance (
Ω
)
INSTALLATION
If the resistance is not within the standard range, replace the
PAIR control solenoid valve with a new one.
Installation is in the reverse order of removal.
• Connect the PAIR control solenoid valve lead wire coupler
and PAIR hoses securely. (
10-24)
12V
Содержание GSX-R1000 2007
Страница 1: ...9 9 5 0 0 3 9 3 1 0 0 1 E GSX R1000 PDF processed with CutePDF evaluation edition www CutePDF com...
Страница 43: ...PERIODIC MAINTENANCE 2 31...
Страница 100: ...3 50 ENGINE TRANSMISSION PARTS LOCATION Countershaft Driveshaft...
Страница 153: ...ENGINE 3 103 10 N m 1 0 kgf m 7 0 lb ft 23 N m 2 3 kgf m 16 5 lb ft...
Страница 333: ...7 20 COOLING AND LUBRICATION SYSTEM ENGINE LUBRICATION SYSTEM MAIN GALLERY To sub gallery To sub gallery...
Страница 334: ...COOLING AND LUBRICATION SYSTEM 7 21 To transmission SUB GALLERY MAIN GALLERY VIEW OF A A...
Страница 507: ...SERVICING INFORMATION 10 29 COWLING INSTALLATION B A1 To A To A1 A To B To Radiator heat shield...
Страница 508: ...10 30 SERVICING INFORMATION FRAME COVER INSTALLATION SEAT LOCK CABLE ROUTING...
Страница 514: ...10 36 SERVICING INFORMATION PILLION FOOTREST INSTALLATION Footrest X Apply grease to sliding surface...
Страница 548: ...Prepared by January 2007 Part No 99500 39310 01E Printed in Japan 556...
Страница 549: ...Printed in Japan K7...