4-78 FI SYSTEM DIAGNOSIS
5) If OK, then check the continuity between each terminal and
ground.
Secondary injector continuity:
∞ Ω
(Infinity)
\
09900-25008: Multi-circuit tester set
V
Tester knob indication: Resistance (
Ω
)
Are the resistance and continuity OK?
6) After repairing the trouble, clear the DTC using SDS tool.
(
4-28)
Step 2
1) Turn the ignition switch ON.
2) Measure the secondary injector voltage between Y/R wire
and ground.
Secondary injector voltage: Battery voltage
(
Y/R –
Ground)
NOTE:
Injector voltage can be detected only for 3 seconds after ignition
switch is turned ON.
\
09900-25008: Multi-circuit tester set
W
Tester knob indication: Voltage (
)
Is the voltage OK?
3) After repairing the trouble, clear the DTC using SDS tool.
(
4-28)
YES
Go to Step 2.
NO
Replace the secondary injector with a new one.
(
5-24)
YES
• Lg wire open or shorted to ground, or poor
T
connection (#1 cylinder side)
• Lg/W wire open or shorted to ground, or poor
S
connection (#2 cylinder side)
• Lg/G wire open or shorted to ground, or poor
R
connection (#3 cylinder side)
• Lg/BI wire open or shorted to ground, or poor
Q
connection (#4 cylinder side)
• If wire and connection are OK, intermittent trou-
ble or faulty ECM.
• Recheck each terminal and wire harness for
open circuit and poor connection.
• Replace the ECM with a known good one, and
inspect it again.
NO
Open circuit in the Y/R wire.
1
2
V
ECM coupler (Harness side)
2
(Black)
(Gray)
Содержание GSX-R1000 2007
Страница 1: ...9 9 5 0 0 3 9 3 1 0 0 1 E GSX R1000 PDF processed with CutePDF evaluation edition www CutePDF com...
Страница 43: ...PERIODIC MAINTENANCE 2 31...
Страница 100: ...3 50 ENGINE TRANSMISSION PARTS LOCATION Countershaft Driveshaft...
Страница 153: ...ENGINE 3 103 10 N m 1 0 kgf m 7 0 lb ft 23 N m 2 3 kgf m 16 5 lb ft...
Страница 333: ...7 20 COOLING AND LUBRICATION SYSTEM ENGINE LUBRICATION SYSTEM MAIN GALLERY To sub gallery To sub gallery...
Страница 334: ...COOLING AND LUBRICATION SYSTEM 7 21 To transmission SUB GALLERY MAIN GALLERY VIEW OF A A...
Страница 507: ...SERVICING INFORMATION 10 29 COWLING INSTALLATION B A1 To A To A1 A To B To Radiator heat shield...
Страница 508: ...10 30 SERVICING INFORMATION FRAME COVER INSTALLATION SEAT LOCK CABLE ROUTING...
Страница 514: ...10 36 SERVICING INFORMATION PILLION FOOTREST INSTALLATION Footrest X Apply grease to sliding surface...
Страница 548: ...Prepared by January 2007 Part No 99500 39310 01E Printed in Japan 556...
Страница 549: ...Printed in Japan K7...