V 01-2017
www.superwind.com
28
7.2 Mast
mounting
Before your
Superwind
can be
installed on the mast or support,
the electric cables must be led
through the mast tube and
connected to the generator with
the correct polarity (Section
6.3.3 on page 22).
The following applies to any type of mast or support:
Before assembling
the wind generator,
make sure that,
from the mast top
to a point 650 mm below,
there are no
projecting fittings or ropes
which could obstruct
the rotor
(Graphic No. 7.2.1.2).
This is important because the rotor controller pitches the blades at high wind
velocities, which will reduce the distance from the mast.
Содержание 350 12V
Страница 1: ...www superwind com Superwind 350 12V 24V Manual North Central and South America regions 01 2017...
Страница 2: ...V 01 2017 www superwind com 1 Page intentionally left blank...
Страница 52: ...V 01 2017 www superwind com 51 ATTACHMENT A Stop Switch Mounting Guidelines...
Страница 53: ...V 01 2017 www superwind com 52 STOP SWITCH Mounting Guidelines Manual 01 2017...
Страница 60: ...V 01 2017 www superwind com 59 ATTACHMENT B Superwind Charge Regulator 12V Marine...
Страница 61: ...V 01 2017 www superwind com 60 Charge Regulator 12V Marine Instructions Manual 01 2017...
Страница 70: ...V 01 2017 www superwind com 69 ATTACHMENT C Superwind Charge Regulator 24V Marine...
Страница 71: ...V 01 2017 www superwind com 70 Charge Regulator 24V Marine Instructions Manual...